MICE Running Schedule and Current Issues - Summer 2011

The MICE run schedule for Summer 2011 outlines an operational period from 1 PM to 9 PM, allowing up to 2 V.ms of beam loss for 8 hours a day during user runs. Shorter periods may allow for 4 V.ms, while extended run times should maintain under 2 V.ms, subject to discussion with ISIS. Current issues include temperamental dipole systems, temperature monitoring requirements, potential BPM misconnection, and persistent PPS issues primarily affecting the inner and outer doors.

nubia
Télécharger la présentation

MICE Running Schedule and Current Issues - Summer 2011

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MICE Running Summer 2011 A. Dobbs, 8th July 2011, MICE CM30

  2. Conditions • Up to 2 V.ms of beam loss for 8 hrs a day during user run • Might be allowed 4 V.ms for shorter periods or < 2 V.ms for longer (discuss with ISIS) • Current schedule is 8 hrs a day from 1pm to 9pm up to 2 V.ms only (Hall available until 11am) • Avoid night running (Andy) A.Dobbs CM30

  3. Current Issues • DS is temperamental • Dipole temperatures need to be watched • BPM channel may be mis-connected • PPS issues remain (especially inner and outer door) A.Dobbs CM30

  4. MICE Run Plan- Summer 2011 A.Dobbs CM30