DSF cooling plant progress

The test section of the cooling plant is constructed at Bosch, pending a few components: one differential pressure transmitter, transparent plastic pipe windows, temperature transmitters, and a flowmeter. Upcoming activities include degassing the dummy sector, cleaning the test section, and installing the flowmeter with ELMB connections. Once all systems are in place, we will connect loops to the SS pipes outside DSF and begin testing, first without and then including the test section. Additional tasks involve sensor calibration and data integration.

nuncio
Télécharger la présentation

DSF cooling plant progress

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. DSF cooling plant progress A. Francescon and M. Janda

  2. Test section status The test section is already built on the Bosch. We only miss: • one differential pressure transmitter • tranparent plastic pipe as windows • temperature transmitters • flowmeter

  3. Test section next activities • Dummy sector degassing • Test section cleaning • Flowmeter installation and connection to ELMB.

  4. The plant The plant should be ready to move to DSF. After the arrival we havo to: • connect the loops to the SS pipes outside DSF; • close the line inside DSF (maybe excluding the test section?); • (install capillaries in between?). Then we can start to test the plant, initially without the test section, then adding also the test section.

  5. Other activities • ELMB and sensor calibration; • Finalize the readout of all sensors; • Integration between data from the plant and data from the test section in a single PVSS project.