An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The future of DC work all

  2. Restructuring of DC and Detector Work • for many reasons the DC work was not very efficient in the past • site team does 70% of the time DC work • only high priority task could be addressed by site team • proposal of new structure: • re-organize work done at the site → detector team • perform the DC work in the search groups and in the detector group • ensure the connection between the search groups and the detector group by having a detector group member in each search group • increase manpower in detector group GEO DC workshop June 2004

  3. DC work in search groups • find artifacts in data that cause problems in the analysis • info transferred to detector group, they discuss the problem and • improve the detector to avoid artifacts or • suggest veto back to search group • follow up analysis on triggers • request information from detector group on instrumental and PEM channels for trigger time • monthly review of the sensitivity and state goals for improvements (frequency domain and time domain) • input to prioritization of detector optimization work GEO DC workshop June 2004

  4. S4 – Dates and Goals • S4 will start Jan 7th and will last for 4 weeks • LIGO goals: • Sensitivity goals, inspiral range: • H1: 7.5 Mpc • L1: 4 Mpc • H2: 2 Mpc • Duty cycle: • 70% individual ifos, 40% triple • GEO goal: • be factor of 3 for significant frequency range within worth LIGO detector, • duty cycle: 90% GEO DC workshop June 2004

  5. S4 – preparation and shifts • hardware freeze: Dec 12th • control room preparation until Dec 22th • LabView control computer • operator monitors • operator manual • search group monitors • DC work environment for operator • SMS alarms • operator shifts • 6h – 14:30h, 14h – 22h, no overnight shifts GEO DC workshop June 2004