nydia
Uploaded by
33 SLIDES
609 VUES
350LIKES

BallBot

DESCRIPTION

BallBot. Brian Kosoris Jeroen Waning Bahati Gitego Yuriy Psarev 10/11/2011. System Overview. Mechanical Structure Base Vertical structure Landing gear Electronics Sensors Actuators/Motors Control System State-space variable model MatLab / Simulink code Synthesis of 3D motion.

1 / 33

Download Presentation
Télécharger la présentation

BallBot

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. BallBot Brian Kosoris Jeroen Waning BahatiGitego YuriyPsarev 10/11/2011

  2. System Overview • Mechanical Structure • Base • Vertical structure • Landing gear • Electronics • Sensors • Actuators/Motors • Control System • State-space variable model • MatLab/Simulinkcode • Synthesis of 3D motion

  3. Mechanical Design (CAD) • Base • Critical mechanism • Mechanical function impacts success • Aluminum vs. steel? • Feasibility • Cost • Workability • Aesthetics • Strength/rigidity vs. weight • Two perpendicular pairs of motors (@ 45’s) • Built in damper for vertical disturbances

  4. Mechanical Design (CAD) Top View Bottom View

  5. Mechanical Design • Vertical structure • Simple aluminum frame • Multiple modular-plateau design • Houses main CPU, IMU board, power supply, etc. • Modular/adjustable for optimization • Facilitates testing phase • Adjustable center of mass • Serves as a three-dimensional inverted pendulum • Bolt-able design for quick adjustments

  6. Mechanical Design (CAD) • Landing gear • Supplemental ‘fail-safe’ design • Protects investment • Backup if minimum success criteria is not met • i.e. BallBot topples over • Simple & effective • Worm-screw actuator design • Encapsulates ball when BallBot is balanced

  7. Electrical Components • New components • Micro ITX gigabyte board • High-level CPU to run MatLab • Processes integer data from IMU board • Runs control algorithm to digest sensor data • Provides output to motor controllers • 100% onboard control for self-sufficiency • A321 batteries x 30 for onboard power supply • Provides 12-16.5V (3-5A) to motors • Provides 5V for digital logic (IMU board and CPU)

  8. Micro ITX onboard Computer • 1.6GHz CPU • 4GB DDR3 • Windows 7 • MatLab2010 • Rotational matrix manipulation • State-space matrix processing

  9. IMU Board • Arduino ATmega2560 • Microcontroller/microprocessor • ADXL345 Accelerometer • Three-axis acceleration measurement unit • IDG500 Gyroscope • Two-axis angular velocity measurement unit • Provides real-time feedback of inertial orientation/rotation in 3D space

  10. IMU Board

  11. Sensor Data Processing • IMU data will be relayed to onboard computer • MatLab will process complex state-space equations and rotational matrices • Control system theory is used to model the system for analysis of stability • Robotics synthesis • Rotational matrices synthesize the robots orientation and angular velocity • MatLab will process the matrices to provide feedback to the Arduino which sends signals to the motor controllers

  12. Electronics Overview

  13. Controller Overview • State-space subsystem block diagram

  14. Controller Simulation • Subsystem • Block-diagram representation of inside subsystem

  15. Controller Simulation • State-space modeling • x’ = Ax + Bu; y = Cx + Du • MatLab A = 0 0 1.0000 0 0 0 0 1.0000 0 -198.9738 -0.0567 0.0567 0 42.8060 0.0092 -0.0092 B = 0 0 0 1 C = 1 0 0 0 D = 0

  16. State-space model (cont.) controllability_matrix = 0 0.61661 -0.040635 19.844 0 -0.099717 0.0065714 -4.2689 0.61661 -0.040635 19.844 -2.6754 -0.099717 0.0065714 -4.2689 0.5025 Controllable_Rank_is = 4 observability_matrix = 1 0 0 0 0 0 1 0 0 -198.97 -0.056727 0.056727 0 13.715 0.0037383 -198.98

  17. State-space model (cont.) Obsevabile_Rank_is = 4 Poles = 0 -6.5686 6.5168 -0.014085 Kd = -36.621 -1698.7 -40.986 -423.26 pole_placement = -14 -5 -240 -180 L = 438.93 -4372.5 51264 -26241 K_f = -0.14086 -886.74 -1.4844 -141.81 K_i = -0.0071253

  18. State-space model (cont.) K_LQR = -0.14086 -886.74 -1.4844 -141.81 -0.0071253 new_A_by_K_gain = 0 0 1 0 0 0 0 0 1 0 0.086857 347.8 0.85855 87.502 0.0043935 -0.014046 -45.618 -0.13884 -14.151 -0.00071051 1 0 0 0 0

  19. Robot Motion Synthesis • BallBot’s orientation/angular motion can be represented with rotational matrices • Euler angles indicate roll, pitch, and yaw of the BallBot due to disturbances (gravity, wind, push) • Simplifies balancing/stability algorithm

  20. Robot Motion Synthesis • Frame 0 = 00X0Y0Z0 • Frame 1 = 01X1Y1Z1 • Position vector 0 = 3x1 matrix = [0 0 1] T • Position vector 1 = [ ] = 3x1 matrix • The angular velocities ωψ, ωϕ, ωθrepresent the data provided by the IMU board and are integrated to find position

  21. Robot Motion Synthesis • The rotational matrix is very complex in terms of possible orientation synthesis • The axes of frame 0 and frame 1 are compared with the dot product of the components of position vector 0 and position vector 1

  22. Robot Motion Synthesis • All possible orientations: • C1 = Cos(ψ), C2 = Cos(ϕ), C3 = Cos(θ) • S1 = Sin(ψ), S2 = Sin(ϕ), S3 = Sin(θ)

  23. Design Requirements – Major milestones • In this phase of the design: • The mechanical structure must be completed by October 20th, 2011 • Electronics can then be integrated into assembly (October 27th) • Arduino and MatLab communication algorithm (November 2nd) • Begin preliminary testing (October 27th – November 10th) • Finalize complete algorithm (November 16th) • Optimization, aesthetics, minor revisions (November 27th)

  24. Gantt Chart

  25. Trade Study – IMU Board

  26. Trade Study – Accelerometer Filter • ADXL345 • Capacitor bandwidth filter – band-limiting filter • Noise reduction – (dispose of anomalous data) • Anti-aliasing – (prevent data loss due to resolution change) • X & Y max bandwidth – 1650Hz • Z bandwidth – 550Hz • Minimum capacitance = 0.0047μF

  27. Trade Study – Accelerometer Filter • Bandwidth filter - capacitor selection • Capacitance decides bandwidth • Bandwidth indicates data resolution Table 1 – Bandwidth vs. Capacitance • Cx, Cy, Cz pins on ADXL345 • Low-pass filtering • Noise reduction • 3-dB bandwidth equation • F−3 dB = 1/(2π(32 kΩ) × C(X, Y, Z))

  28. Trade Study – Accelerometer Filter • F−3 dB = 1/(2π(32 kΩ) × C(X, Y, Z)) • Approximates to F–3 dB = 5 μF/C(X, Y, Z) • 1650 Hz = 5 μF/0.00303 μF • Cx = Cy = 0.00303 μF • 550 Hz = 5 μF/0.0091μF • Cz = 0.0091 μF • These capacitor values will provide the highest data resolution for • 1650 readings per second for X and Y acceleration • Detect smallest possible acceleration in planar motion • 550 readings for Z acceleration • The Z axis will thus represent the vertical axis of the BallBot from the center of the ball to the top of the BallBot • Then Z-axis data does not require high resolution

  29. Trade Study – Accelerometer Filter • Rms noise= Noise Density x sqrt(BW) • Noise is thus a factor of bandwidth Table 2 – Noise Density

  30. Trade Study – AccelerometerOperating Voltage • The ADXL345 output is ratio-metric • The output sensitivity (or scale factor) varies proportionally to the supply voltage. • VS = 3.6 V - output sensitivity = 360 mV/g • VS = 2 V - output sensitivity =195 mV/g. • Arduino’s 3v3 pin supplies 3.3V • Sensitivity thus approximates to 320 mV/g to 340 mV/g (or 330 mV/g average) • Sensitivity estimated to be adequate for BallBot • Arduino’s built-in serial monitor read consistent data • Only real-time testing will confirm

  31. Trade Study – AccelerometerOperating Voltage X-Y-Z sensitivity (voltage/gravity) Data Sheet

  32. References • Arduino – microcontroller (libraries/tutorials) • www.arduino.cc • SparkFun – sensors/electronics (datasheets) • www.sparkfun.com • MatLab resource (control system toolbox, etc.) • http://www.mathworks.com/matlabcentral/fileexchange/23931 • SolidWorkshelpfile • http://help.solidworks.com/2012/English/SolidWorks/sldworks/r_welcome_sw_online_help.htm • Robot Modeling and Control (textbook) • Control Systems Engineering (textbook)

  33. Title • Contents

More Related
SlideServe
Audio
Live Player
Audio Wave
Play slide audio to activate visualizer