East Bay Bus Rapid Transit Project

East Bay Bus Rapid Transit Project. WEBINAR FOR RFQ NO. 2013-1263, Lead Artist for Integrated Artistic Enhancements at East Bay Bus Rapid Transit Stations (EB-BRT ) AND RFQ NO. 2013-1264, Pre-qualified Pool of Supporting Artists and Artisans for Integrated Artistic Enhancements

oakley
Télécharger la présentation

East Bay Bus Rapid Transit Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. East Bay Bus Rapid Transit Project WEBINAR FOR RFQ NO. 2013-1263, Lead Artist for Integrated Artistic Enhancements at East Bay Bus Rapid Transit Stations (EB-BRT) AND RFQ NO. 2013-1264, Pre-qualified Pool of Supporting Artists and Artisans for Integrated Artistic Enhancements at East Bay Bus Rapid Transit Stations December 2, 2013

  2. Artistic Enhancement – Overall Theme • Conceptual theme for artistic enhancements: Honor the Past and Celebrate the Future • Artists will broaden and further interpret the theme as their ideas evolve. • The sum total of all artistic enhancements: • Help to establish an identity for the EB-BRT system and • Reflect neighborhood and community character at stations.

  3. Project Area Map • Total of 34 stations • 21 median stations • 12 pairs of curbside stations

  4. Role of Lead Artist(s) • The Lead Artist(s) will work closely with the EB-BRT design team • Artist Team(s) formed for the EB-BRT will: • Create artistic enhancements integrated with certain station design elements (Standard and Enhanced) • Directly interact with the local community • Prepare conceptual design of the artistic enhancements

  5. Role of Supporting Artist(s)/Artisan(s) • The Supporting Artist(s)/Artisan(s) will join with the Lead Artist in creating integrated artistic enhancements for the BRT stations • As part of the Artist(s) Team they will: • Assist in the development of the design of integrated artistic enhancements • Join in interacting with the local community • Self-fabricate a design or create a design that is fabricated otherwise

  6. EB-BRT Artist Team(s) AC Transit to select one Lead Artists for the entire corridor or or up to three Lead Artists, one for each corridor grouping (see map on next slide) Lead Artists to select a minimum of one or up to two Supporting Artist(s) and/or Artisan(s) from the Pre-Qualified Pool Lead Artists contract with AC Transit Supporting Artists and/or Artisans contract with Lead Artist

  7. East Bay BRT Project Corridor & Stations

  8. Artistic Enhancement Opportunities Median Station Curbside Station

  9. Artistic Enhancement Opportunities Curbside Station

  10. Artistic Enhancement Opportunities Curbside Station

  11. Artistic Enhancement Opportunities Median Station

  12. Artistic Enhancement Opportunities Median Station

  13. Artistic Enhancement Opportunities Median Station

  14. Artistic Enhancement Opportunities Median Station

  15. Overall Project Schedule • Early 2014 • Artists selected and taken under contract • 2014 – Final Design • Artists will begin work with BRT Design Team immediately following contract negotiations • 2015 – Construction • Platforms & Installation of Artistic Enhancements

  16. How to apply – Overview of Submittals

  17. How to apply – PART II: Required Forms • Carefully review all submittal requirements • Responsive submittals must includeallforms filled out, including: 1. Form “Certification Regarding Lobbying” (pg 33 - 37) 2. Form “Designation of Subcontractors” (pg 38 - 40) 3. Form “Certification of Proposed Contractor Regarding Debarment…” (pg 42) 4. Form “Buy America Certificate” (Page 43) • If form does not apply to you: mark with N/A, sign, and submit with other forms

  18. How to apply – Part II: Required Forms Submit 8 (eight) hardcopies of allforms Hardcopies must be sent or delivered to AC Transit (to address on RFQ cover sheet)

  19. For those who already submitted • Carefully review what you submitted • If in doubt about whether you included all forms with your initial submittal of PART II: • Notify Jon Medwin(AC Transit Director of Procurement & Materials at jmedwin@actransit.orgor 510- 891-5474) of your error • Resubmit the entire PART II of your submittal • Do not just send missing forms

  20. RFQ Process – Important Dates* * Dates subject to potential change

  21. For Further Information • Visit www.actransit.org • Contact Jon Medwin AC Transit Director of Procurement & Materials: Email: jmedwin@actransit.org Or call: (510) 891-5474 • Thank You and Good Luck!