SlideServe
Menu
Préférences
© SlideServe · v2026

Evaluation of Segmentation Techniques for Spare Parts Inventory Management: Phase 1

oberon avatar
3 diapositives · 503 Views · Sep 12, 2014

ACWT. Admin Lead Time (4 days). Supply Stock. AIMD 4 - 7 days. RTAT/EXREP. Resupply. Repair. BCM. (19/15 days). BCM Rate 41%. Retrograde (21 days). Wholesale Stock. $ Attrition Replenishment (12-24 Months). AWM. Depot. RTAT (45 days). Pack & Receipt (4 days).

Evaluation of Segmentation Techniques for Spare Parts Inventory Management: Phase 1 - slide 1
01 / 3Evaluation of Segmentation Techniques for Spare Parts Inventory Management: Phase 1
1 / 17

Télécharger la présentation

Evaluation of Segmentation Techniques for Spare Parts Inventory Management: Phase 1
Une image / un lien ci-dessous est fourni (tel quel) pour télécharger la présentation

Politique de téléchargement : le contenu du site vous est fourni TEL QUEL pour votre information et votre usage personnel ; il ne peut être vendu, concédé sous licence ni partagé sur d’autres sites sans l’accord de son auteur.Le contenu vous est fourni TEL QUEL, pour votre information et votre usage personnel uniquement. Téléchargez la présentation en cliquant sur ce lien. Lors du téléchargement, si vous ne parvenez pas à télécharger une présentation, l’éditeur a peut-être supprimé le fichier de son serveur.Pendant le téléchargement, si vous ne parvenez pas à obtenir une présentation, le fichier a peut-être été supprimé par l’éditeur.

F I N

Plus de contenu associé

Transcription de la présentation
  1. ACWT Admin Lead Time (4 days) Supply Stock AIMD 4 - 7 days RTAT/EXREP Resupply Repair BCM (19/15 days) BCM Rate 41% Retrograde (21 days) Wholesale Stock $ Attrition Replenishment (12-24 Months) AWM Depot RTAT (45 days) Pack & Receipt (4 days) (Attrition) Evaluation of Segmentation Techniques for Spare Parts Inventory Management: Phase 1 Researcher: Manuel D. Rossetti, Ph. D., P.E. Graduate Assistant: Ashish V. Achlerkar Sponsor: Naval Systems Supply Command • Large number of spare parts to manage • High computational time and cost for policy calculations • Conventional grouping techniques do not consider operationally relevant part attributes • Need to provide differentiated service to spare parts depending upon their importance for the overall supply chain goals • Need to revise the inventory segmentation policy suggested in the NISS report in lieu of the “Readiness Based Customer-Wait Time Sparing Model Reference: Cdr.Ackart presentation slides Representative example of a Multi-echelon inventory system

  2. CELDi Center for Engineering Logistics & Distribution Research Contributions • Developed two new inventory segmentation techniques to provide an alternative to conventional inventory segmentation techniques • Developed and automated a data-generation mechanism to simulate datasets for different types of inventory systems • Evaluated different inventory segmentation techniques using experimental design • Provided general recommendations for inventory segmentation in multi-indentured, multi-echelon inventory systems

  3. CELDi Center for Engineering Logistics & Distribution Phase 2: Multi-Echelon, Multi-Indentured Spare Part Segmentation Methodologies • Expand results of phase 1 to multi-echelon setting • Investigate clustering and segmentation policies • Develop new data generation mechanisms • Develop easy to implement multi-echelon models for testing • Expand results to multi-indentured systems • Investigate mathematical formulations of clustering approaches at the same time as policy optimization