Progress Update on The Chain Game: Abilities, Art, and Development Milestones
270 likes | 377 Vues
The Chain Game project is advancing steadily, with recent milestones encompassing player abilities, art design, and programming. Key achievements include finalizing player abilities and modeling characters and environments. The design process has been enriched by personality profiles, enhancing character dynamics. Upcoming tasks involve playtesting, sound asset development, and integrating procedural elements. The chain ability, essential for the vertical slice, is being carefully crafted to balance humor and morbidness. Stay tuned for more updates on our development progress, as we approach exciting next steps!
Progress Update on The Chain Game: Abilities, Art, and Development Milestones
E N D
Presentation Transcript
Overview • Current Milestone Schedule • Player Abilities • Chain Ability for Vertical Slice • Design Progress • Art Progress • Programming Progress • What’s next?
Current Milestone Schedule • Design • 1/24 - Player Abilities Submitted • 1/26 - Player Abilities Finalized • 1/27 - Personality Profile Meeting • 1/28 - Personality Profiles and Player Rip-O-Matic • 1/28 - Filter All Abilities Through Tone • 1/29 - Blue Box Asset List • 2/2 - Level Progression • 2/2 - Create Designs for Environment Puzzles
Current Milestone Schedule • Design • 2/3 - Play Test Current Build • 2/4 - Blue Box Sound Asset List • 2/4 - Outline Finished For Development Plan • Art • 1/30 - Blue Box 1 Environment Modeled and Textured • 1/30 - Player Characters Modeled and Textured • 2/4 - List of Secondary Characters Narrowed Down
Current Milestone Schedule • Animation • 1/27 - Chain Prototype in Engine • 2/2 - Basic Movements Animated • 2/2 - Jump Animated • Programming • 1/25 - PhysX GSA Loading • 1/27 - Chain Prototype in Engine • 1/27 - Character Loading
Current Milestone Schedule • Programming • 1/27 - Character Movement • 1/27 - PhysX Integration • 2/1 - Character Jumping • 2/4 - Chain Integration
Player Abilities • Filtered platforming and chain abilities through our tone. • Example Abilities: • Punt Kick • Dart Throw • Hammer Swing • Fire Rocket • Garrote
Chain Ability for Vertical Slice • Needed to be both morbid and humorous • Good representation for the Vertical Slice • Possible Choices: • Skeleton Whip • Body Sled • Punt Kick • Over the Head Hammer • Ceiling/Wall Anchor • Final Decision: • Punt Kick
Design Progress • Personality Profiles • “Melvin” • “The Bitch”
“Melvin” • Largely Underappreciated • Tries to succeed, but ultimately fails • Passive, Timid • Self Critical and Under Confident • Bottles his frustrations • Snaps when his breaking point is reached
“Melvin” • Relationship with “The Bitch” • Exercise in Patience • Always Being Undermined and Ridiculed • Relationship with Secondary Characters • Subject of Ridicule and Mockery • Persecuted at Every Turn • Relationship with Environment • Feels Like Home • Sense of Pride
“The Bitch” • Spoiled • Type A Personality • Impatient • Distinct Lack of Enthusiasm or Interest
“The Bitch” • Relationship with “Melvin” • Needed for Survival, but Nothing More • Realizes his Circumstance and Exploits It • Relationship with Secondary Characters • Treats Them Little Better Than “Melvin” • Mildly Respects Those in Power • Relationship with Environment • Disinterested • Mocks the Run Down State of the Afterlife
Art Progress • Characters Modeled • “Melvin” • “The Bitch”
Art Progress • Environment Modeled
Animation Progress • Running • Walking • Stop
Programming Progress • Character Loading • Character Controls • Character Movement • PhysX Nif Loader
What’s Next? • Design • Blue Box Asset List • Level Progression • Create Designs for Environment Puzzles • Sound Asset List • Development Plan Outline • Art • Texture Environment • Texture Player Characters • Secondary Characters Narrowed Down
What’s Next? • Animation • Jumping Animation • Programming • Load Chain Procedurally in Engine • Character Jumping • Chain Integration