  1. Virtual Design and Construction Case StudyMartin FischerCristina GarciaCalvin KamJohn KunzKathleen ListonMarcus SchreyerVibha Singhal

  2. Source: DPR

  3. Virtual Design and Construction Case Study • Case Overview • Baseline • Delay • Acceleration • Summary and Analysis

  4. Site Plan

  5. Construction Photos and Site Context

  6. Virtual Design and Construction Case Study • Case Overview • Baseline • Delay • Acceleration • Summary and Analysis

  7. Site Plan

  8. Construction Photos and Site Context

  9. Virtual Design and Construction Case Study • Case Overview • Baseline • Delay • Acceleration • Summary and Analysis

  10. Site Plan

  11. Construction Photos and Site Context

  12. Virtual Design and Construction Case Study • Case Overview • Baseline • Delay • Acceleration • Summary and Analysis

  13. Site Plan AP AR AT

  14. Construction Photos and Site Context

  15. Virtual Design and Construction Case Study • Case Overview • Baseline • Delay • Acceleration • Summary and Analysis

  16. Common Point 4D Color Legend for iRoom Demo SimVision Color Legend for iRoom Demo Direct Work Hidden Work

  17. 3D Legend Diagram

  18. Virtual Design and Construction Case Study • Case Overview • Baseline • Delay • Acceleration • Summary and Analysis

  19. Baseline Case Target 2002 Thanksgiving and Christmas season Tight site -> single crew per trade Low coordination risk, but little slack

  20. Functional Requirements (Time and Cost)

  21. Virtual Design and Construction Case Study • Case Overview • Baseline • Delay • Acceleration • Summary and Analysis

  22. How we spend time in meetings • PREDICTIVE (10%) • Can we get access to the parking a week earlier? • DESCRIPTIVE (40%) • When do we have access to retail zone AR-7? • Where are you placing the crane? • EXPLANATIVE (20%) • What drives the turnover date for the theater? • EVALUATIVE (30%) • Which acceleration alternative is better?

  23. 4D Demo (Plan View)

  24. 4D Demo (Perspective View)

  25. MSP and Time-Controller Demo

  26. Virtual Design and Construction Case Study • Case Overview • Baseline • Delay • Acceleration • Summary and Analysis

  27. SimVision Demo(highlights activity received from MSP)

  28. MSP sends activity to SimVision

  29. Virtual Design and Construction Case Study • Case Overview • Baseline • Delay • Acceleration • Summary and Analysis

  30. Micro View

  31. Macro View—Organization and Process

  32. Virtual Design and Construction Case Study • Case Overview • Baseline • Delay • Acceleration • Summary and Analysis

  33. Predicted Critical Path Predicted Work Composition

  34. Schedule Growth Risk Predicted Work Composition

  35. Virtual Design and Construction Case Study • Case Overview • Baseline • Delay • Acceleration • Summary and Analysis

  36. Delay Case Hazardous materials found during excavation 2-month delay (MSP #56)

  37. 4D Demo (Baseline Case)

  38. 4D Demo (Delay Case)

  39. MSP+Time Controller Demo(Delay Case)

  40. Virtual Design and Construction Case Study • Case Overview • Baseline • Delay • Acceleration • Summary and Analysis

  41. Functional Requirements (Time)

  42. Functional Requirements (Cost)

  43. Virtual Design and Construction Case Study • Case Overview • Baseline • Delay • Acceleration • Summary and Analysis

  44. How to accelerate construction?

  45. Virtual Design and Construction Case Study • Case Overview • Baseline • Delay • Acceleration • Summary and Analysis

  46. 4D DemoOpportunities for Acceleration