Real-Time Warning System for Drivers Using GPS and Remote Traffic Signal Database

DESCRIPTION

This project, presented by Ron Herman with instructor Mr. Moni Orbach at the Technion Institute, aims to develop a real-time warning system for drivers. The system will utilize GPS data from a cellular phone and connect to a remote database for up-to-date traffic signals and special events. Key features include implementing warning signals when approaching stop signs if speed limits are exceeded, and generating traffic condition reports based on current location. The use of Microsoft SQL-Server ensures modularity and performance in managing the remote database.

1 / 15

Télécharger la présentation

Real-Time Warning System for Drivers Using GPS and Remote Traffic Signal Database

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Technion – Israel Institute Of Technology Electrical Engineering Department Project Characterization Virtual Traffic Signal Presented by: Ron Herman Ofir Shentzer Instructor: Mr. Moni Orbach

  2. Project’s Goals • Define and implement a warning system for a vehicle driver, that will play as a real time warning signal. • Design and Construct a traffic signal data base, which would hold relevant information. • Develop an algorithm for data updating, while acting under system constraints.

  3. System Inputs The System relies on input from two different sources: • GPS (Global Positioning System), which is installed within a 3G cellular Phone. • Remote data base, which will be connected as means of updating local system data base.

  4. System Input : 1. GPS The GPS provides three main variables: • Direction. • Location. • Velocity.

  5. System Input : 2. Remote DB The remote data base is accessed via cellular communication. The data base holds a complete set of traffic signals, special events and their locations. The desired information is send to the local machine on demand. (according to pre- designed algorithm)

  6. System Output The system invokes two types of alarms: • Warning signal according to predetermined use-cases. • Traffic condition reports relevant to current location.

  7. System Block Diagram Remote Data Base Local Machine GPS & GSM Card Interface Controller Local Data Base Processing Unit User Interface

  8. Database’s Implementation Remote DB will be implemented using Microsoft SQL-Server technology, for better performance and modularity. As a start, for testing use, the remote DB will be stored on one of the laboratory’s servers, and will be accessed via lab network comunication (modeling celluar network).

  9. Example Use case • Approaching a Stop sign : As the car enters the sign’s defined access space (defined in the DB). It’s (the car’s) speed is checked (speed taken from GPS card data). If the car exceeds the pre-defined speed limitation (shown in a graph on the next slide and implemented in the system’s processing module) a warning signal is passed to the driver. • A sample check is taken every pre-defined fixed time interval.

  10. Example Use case (cont.) Forbidden Area

  11. Time Schedule (cont.) • Week 1 (till Thursday 6/5/2004) - define database’s internal formation - learning database’s implementation method - define (along with parallel group) GSM card interface

  12. Time Schedule (cont.) • Week 2 (till Thursday 13/5/2004) - start of database implementation - start design of GPS card simulator

  13. Time Schedule (cont.) • Week 3-4 (till Thursday 27/5/2004) - continue work on database implementation - finish design and implementation of GPS card simulator

  14. Current Semester’s Goals • Implementing GPS card simulator. • Completing work on remote DB. • Gathering ideas for Local DB storing and processing algorithms.