1 / 6

Iron Horse Park ( Shaffer Landfill)

Source: http://billerica.wickedlocal.com/. Iron Horse Park ( Shaffer Landfill). Don McElroy, EPA Region 1, Remedial Project Manager. Site Location. Shaffer Landfill Remedy. The capping of Shaffer Landfill involved: Placement of subgrade soils over regarded waste providing:

Télécharger la présentation

Iron Horse Park ( Shaffer Landfill)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Source: http://billerica.wickedlocal.com/ Iron Horse Park (Shaffer Landfill) Don McElroy, EPA Region 1, Remedial Project Manager

  2. Site Location

  3. Shaffer Landfill Remedy The capping of Shaffer Landfill involved: • Placement of subgrade soils over regarded waste providing: • 5% grade on top deck • Smooth subgrade surface on side slopes • Installing textured membrane liner over entire landfill • Installing synthetic drainage layer (drain net) over entire landfill • Installing filter fabric over drainage layer • Installing 18” of soil as top layer (to be seeded) Construction included: • Stormwater conveyance systems and detention basins • Combined landfill gas and leachate collection wells • Landfill gas flare • Perimeter fence.

  4. Construction

  5. Shaffer Landfill Cleanup

  6. Contact Information Don McElroy EPA Region 1 mcelroy.don@epa.gov (617) 918-1326

More Related