This project involves a series of actions aimed at improving target systems and remote handling protocols at various research facilities. Key objectives include evaluating dose rates after shutdown, completing detailed geometries for FLUKA simulations, assessing shielding requirements, and considering alternative magnet solutions for target prototypes. Collaboration among teams is crucial, and tasks include benchmarking FLUKA simulations, evaluating materials for activation and absorption effects, and refining remote handling scenarios to align with operational constraints and safety requirements.
E N D
Topic Action Items: • D. Target Hall (I. Bailey on behalf of V.B.) • Evaluate dose rates for short times after shutown (1 hour, 1 day) - Andriy (DESY) • Complete detailed target station geometry for FLUKA - Luis (DL) • Include material absorption effects in FLUKA simulations - Andriy (DESY) • Carry out benchmarking of FLUKA using Ti alloy at SLAC - John (SLAC) • Get feedback on impact of 53 hour changeover on availability - Vinod (SLAC) • Evaluate need to include photon collimator in remote-handling module - Lei (Liverpool) • Evaluate activation of water in water-cooled systems - Andriy (DESY) • Evaluate shielding requirements compatible with 53 hour remote-handling schedule - Andriy (DESY) • Evaluate acheivable vacuum. Assess need to evolve pillow seal design. - Ian (Liverpool) • Does ILC plan to have a central hot cell facility? - Vinod (SLAC) • Develop detailed remote-handling scenarios - Mike W (RAL) • Assess need for remote-handling for KAS - Vinod (SLAC)
Topic Action Items: A. Target Systems (I. Bailey/ T. Piggott) • Source alternative magnet solutions for first proposed UK target prototype - Ian B to coordinate. • LLNL to evaluate DL target prototype design for vibrational modes and compatability with water-cooling design (flow rates, etc) - Tom P to coordinate. • Rationalise proposed UK prototyping wrt available funding - Ian B to coordinate. • Continue evaluation of alternative target materials - Chris D to coordinate. • Seek further clarification from BINP on their 1ms OMD work - Vinod B to coordinate. • Adopt common geometry for eddy current simulations (based on UK prototype?) - Jeff G to coordinate. • Beam window issue remains unresolved? Wei + Alexander to discuss.