An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WP7 System Integration and Validation Pere Ridao, Nuno Gracias & GuillemVallicrosa University of Girona GIRONA’14 MORPH Field Experiments 7th to 11th April 2014

  2. Work Package 7 Task 7.4 System validation in a selected demonstrative scenario

  3. MORPH Experimental Roadmap Experiment #10 La Spezia’13 Work Package 7 2013 2014 2015 Experiment #9

  4. DATE: 7/4/2014 - 11/4/2014 • LOCATION: Girona, Catalunya (Spain) • PARTNERS:UdG, CNR, IST, IFREMER, CMRE • IUT, IMAR, ATLAS, • MEANS:UdG: G500 & SPARUS2 AUVs • IFREMER: VORTEX AUV • CNR: CHARLIE USV • Technologyto be tested Online • Bathymetry • PathPlanning • Light BeaconsRelativeNavigation • ROF basedPathFollowing • Visual Odometer? • Technologyto be testedOffline • MultipleVehicle 2D photo-mosaicing • High ResolutionBathymetry Work Package 7 GIRONA’14 MORPH Field Experiments 7th to 11th April 2014 • Goal: Surface CPF & Submerged ROF at constantaltitude: • LSV : CPF+ online micro bathymetry & RTpathplanningforCVxs. • GCV: CPF • CxVs: bottomfollowing + seafloorimagery + ROF

  5. Work Package 7 GIRONA’14 MORPH Field Experiments Vehicle Capabilities by Role 7th to 11th April 2014

  6. Work Package 7 GIRONA’14 MORPH Field Experiments SUCCESS METRICS 7th to 11th April 2014

  7. Work Package 7 GIRONA’14 MORPH Field Experiments Experimental Site 7th to 11th April 2014 Site

  8. Work Package 7 MORPH GIRONA’14 AZORES’14 MORPH Field Experiments MORPH Field Experiments Field Experiments 7th to 11th April 2014 8th to 18th September 2014 2012-2015