VDI Deployment

VDI Deployment. ADeployment Case Study. Getting Physical. We had140 physical single user Windows computers for 1200 students We experienced a 400 student (30%) enrollment increase over the last three years We created a new 40 computer lab the first year to bring the total seat count to 180

onofre
Télécharger la présentation

VDI Deployment

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. VDIDeployment ADeploymentCase Study

  2. Getting Physical • We had140 physical single user Windows computers for 1200 students • We experienced a 400 student (30%) enrollment increase over the last three years • We created a new 40 computer lab the first year to bring the total seat count to 180 • No more physical space for additional computer labs EITC 2/10/2011

  3. The Virtual Desktop Option • Goal: double the number of “seats” with no additional computer lab space • We asked for and received three grants • Provost grant for $60K • Engineering Dean for $90K • HP “switch blade” hardware grant worth $64K • Selected VMware View as the VDI software EITC 2/10/2011

  4. VDI Hardware • The Virtual Desktop Infrastructure includes: • Sufficient VDI Hosting servers with • Lots of RAM • Fast CPUs • High bandwidth networking • Very high performance (low latency-high iops) SAN • High bandwidth network • LAN • SAN EITC 2/10/2011

  5. VDI Software • The Virtual Desktop Infrastructure includes: • VMware View • Microsoft Data center (socket based server license) • Allows Microsoft server 2008 R2 on two servers • MS SQL server • vCenter server & VDI servers • Client OS licenses for the virtual machines EITC 2/10/2011

  6. VDI Hardware @ Iowa • HP C7000 blade server – 16 blades max • Ten BL460 G7 blades • Two sockets per blade – six core per socket • 96 GB RAM • 3 GHz CPU • Ten 10GB fiber networking • 2 console – 4 SAN – 4 LAN • Six 2.4KVA (max) power supplies in a 2N configuration EITC 2/10/2011

  7. VDI Hardware @ Iowa • 208 VAC, 3 phase 30A rack metered and switched power distribution units (PDU) • Street power • UPS power • 10 GB fiber optic network switches • LAN • SAN EITC 2/10/2011

  8. VDI Hardware @ Iowa • Dell EqualLogic 6010 XVS • 2.4 TB SAN storage • ~600 GB of which is SSD (solid state drive) • Auto migration of actively used data to the SSD • High iops - low latency for commonly used data • iSCSI storage array • Used for the golden OS image EITC 2/10/2011

  9. Software @ Iowa • VMware View premier • 2 ea 100 user licenses • M$ client OS licenses for 200 virtual computers • Covered by our campus M$ license W/student option • M$ SQL server license was added to our campus M$ SQL license agreement EITC 2/10/2011

  10. VDI @ Iowa • Our VDI beta 0.5 load is a ~250 GB OS image • A slightly modified lab load • No auto updates • Non-persistent • Graphics are PC over IP • Not the best for intense graphics • Some OS services and features disable to avoid storage growth EITC 2/10/2011

  11. VDI @ Iowa • Standard SAN storage • VMFS presents as a local disk • Two 2 TB volumes allocated for VDI users • Only stores data differences • Folder redirection for Documents and sub folders • Roaming profiles are currently still in use • IP addresses from a DHCP pool EITC 2/10/2011

  12. VDI @ Iowa • 50 VDI clients provisioned • 40 spare but powered off • 10 power up and available • Provisioning a VDI client takes ~10 min • Keeps a head room of 10 available clients as they are assigned to users • 200 client licenses • max simultaneous active users • Powered and unpowered but not used does not take a license • Available to students & faculty EITC 2/10/2011