1 / 6

Telecom Nordic & Baltics Product Presentation

TE Connectivity has long partnered with TDC, serving as the sole supplier of fiber optic products in Denmark and the Nordic region. Through years of collaboration, TE has gained deep insights into TDC's operational challenges and goals for reducing OPEX. Our innovative proposal of pre-stubbed 15” sub-racks offers TDC significant advantages, including reduced termination costs, minimized space requirements, and a competitive edge. The project involved comprehensive engagement with TDC, leading to tailored solutions that meet their distinct needs and enhance project outcomes.

orea
Télécharger la présentation

Telecom Nordic & Baltics Product Presentation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Connectivity Convention Pre-stubbed 15” sub racks & GR3F rack for TDC, Denmark Telecom Nordic & Baltics Product Presentation

  2. Connectivity Convention Background TE has a long relationship with TDC, and has for several years now had the contract with TDC as sole supplier of fiber optic products. Many years of cooperation has given TE a solid knowledge of TDCs challenges and good understanding of how TDCs neverending strive for cutting OPEX can be directed to value added solutions as opposed to lowering prices. We proposed pre-stubbed 15” sub racks to TDC for several reasons among them the most important; - lower cost / termination - less space requirements - Differentiate from competion

  3. Connectivity Convention Process TDC was involved at PM level in several meetings during the process which took approximately 2 years. 1 pilot were TDC installers worked as soundboard was carried out during the process. Another customer in the region had similar requirements, and was taken into the project.

  4. Connectivity Convention Products Sub rack FIST-GPS3-x in combination with OCLP (pre-terminated GPSTF trays) Rack FIST-GR3F-xxx-x Accessories Mounting brackets for sub racks (for front or back mounting in ETSI, 19” or 15”)

  5. Connectivity Convention Results Spin-offs Sales to projects with very confined space, and/or no room for connectors at the front.

  6. Connectivity Convention

More Related