Residual Value

Residual Value. Concept of Residual Value. Similar to a Salvage Value Concept. Most infrastructure will have residual value. Reason for applying residual and method of residuality is a function of Asset Management and Renewal Practice. Cost to renew back to original = 60K

oremillard
Télécharger la présentation

Residual Value

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Residual Value

  2. Concept of Residual Value • Similar to a Salvage Value Concept. • Most infrastructure will have residual value. • Reason for applying residual and method of residuality is a function of Asset Management and Renewal Practice

  3. Cost to renew back to original = 60K Therefore Residual = 40k or 40% Snapshot View • AASB 116 • Depreciation reflects pattern of Consumption. • Must only depreciate depreciable amount. $100,000 $60,000 1 2 3 4 5

  4. What is the Residual? –Million $ Question • Residual depends on renewal practice. • When we replace the component: • Do we renew it back to original LoS? • Do we renew it to a ‘just acceptable’ threshold? • Has the new component got the same expected life as original, less life or more life?

  5. Computing Residual isn’t Rocket Science Let us look at some scenarios. Reezeedool Council - Pavement Component Baseline Case: Typical Structure - 300mm pavement base and 30mm Asphalt. Typical Renewal point: • pavement defect rating 6 and/or • crocodile cracking and ravelling at condition 5 and beyond. Optimal Treatment at this point: • Mill 100mm off the top and mix. • Stabilise. • Roll, Compact and Resurface.

  6. Computing Residual isn’t Rocket Science

  7. Residual Errors – Common ones • Computing residuals in isolation to AM practice. • Assumption that there is no residual. • Assumption that we can look for a state-wide figure to apply for residual. • Assumption that residual is depreciable. • Assumption that residual is an accounting figure, unrelated to asset management.

  8. Suggestions • Understand your context. • Look in the AM plan – what is our standard practice? • Do I have pockets of practice that are statistically valid samples (CBD, outer rural, inner rural). • If my our practice of renewal is fairly consistent, one residual figure across the lot makes sense. • Do not use a sledge hammer to kill a fly !

More Related