90 likes | 179 Vues
Utilize NEMAIS for accurate IPE data management, maintenance scheduling, and budgeting. Optimize equipment lifecycle with detailed instructions and logics assistance. Address IPE concerns efficiently using NEMAIS processes.
E N D
Using NEMAIS for IPE Lean IPE Event 30 June 2005
NEMAIS Process 213 • Uses the term “IDPE” for IPE • Establishes NEMAIS as the database of record for RMC IPE • Treats IPE in an FMA just like installed equipment in a ship • Indicates that RMCs are responsible for accuracy of master data • Refers to Create Equipment (IE01) and Create Functional Location (IL01) transactions Enclosure (4)
NEMAIS Process 213 • Requires action by NEMAIS CDM to enter or change IPE data • Who is your NEMAIS CDM? (Newspaper?) • Incorporates logistics assistance • Initial load includes: • RMC UIC • Equipment description • Serial number • Location Enclosure (4)
Proposed RMC IPE Elements • Load the equipment data in the System (NEMAIS 213) • Create an annual IPE project (NEMAIS 110) • Create an IPE Support Team (NEMAIS 510) • Obtain IPE PMS requirements (Newspaper?) • Create a master schedule of maintenance (Newspaper?) • Create & Complete MWOs for items on the schedule (NEMAIS 230 & 700) • Provide annual budget input (NEMAIS 310) • Maintenance Costs • Replacement Costs • Complete the annual IPE project (NEMAIS 830) OP32 Non Labor Overhead Enclosure (4)
SAP Capabilities – not in scope • Maintenance Plans (PMS Scheduling) • Work Center Capacity (Facilities) • Impact of OOC equipment on capacity • Production Resource Tools • Designation of B&B machines • Planner schedules tool use on MWO • Permits for certain operations
Some Questions • Who should enter/maintain config data? • Has this been done? • Where is the cutoff point for IPE relevance? • Who creates a work candidate for IPE PMS or repair? • Should some IPE be designated PRTs? • What should we do with regard to slide 6? • What about non NEMAIS sites? • What about including RMC UIC in MFOM?
Notes • What should be done with existing excess IPE? Clear/share before DRMO? • How can we address IPE at non NEMAIS locations?