An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Mini-Baja Team #1 Kurt Williams Clifton Anderson David Corpron Joel Dimick Jesse Hubbard Sulav Shakya Team website: www2.eng.utah.edu/me4000wiki/index.php/MiniBaja1/HomePage Instructor: Prof. Samuel Drake Project Update Presentation #4 11/07/05

  2. Presentation Outline • Schedule & Status • Material and Parts Acquisition • Design Update • Critical Function Prototype Team website: www2.eng.utah.edu/me4000wiki/index.php/MiniBaja1/HomePage

  3. Schedule & Status • Upcoming Tasks: • Order Chassis Material (11/10/05) • Carbon Fiber Seat Construction (11/15/05) • Model CFP components (11/23/05) • Fabricate and Weld Roll-Cage (11/29/05) • Overall Status: • On time

  4. Material and Parts Acquisition Rod Ends • Existing Parts: • Shocks • Seat • Limited slip differential • Parts Ordered • Rod Ends • Threaded Inserts • Tires and Rims • Housing for limited slip differential www.midwestcontrol.com

  5. Design Update • Chassis Prototype • Roll-Cage mockup • Solid Modeling • Percentage to date • Remaining modeling Roll-Cage Bend Bend Bend Picture by Mini-Baja #1

  6. Critical Function Prototype (CFP) • Transmission • Forward and Reverse mechanism • Limited Slip Differential • Challenges • Design • Housing • Testing Detroit Locker & Housing Locker Housing Axle input www.highlifter.com/installpdf/Gearless-Locker-2.pdf

  7. Summary • Schedule & Status • On Time • Materials and Parts Acquisition • Awaiting delivery of critical components • Design Update • Start roll-cage fabrication • Critical Function Prototype • Progressing slower than expected

  8. Thanks to Our Sponsors! • A.S.U.U. • Dr. Samuel Drake • Kevin Demass • Lee’s Heating and Air-Conditioning • Liftrucks • Maxxis Tires • Ralph L. Wadsworth Construction • Rugged Rental • U. of U. Engineering Department Team website: www2.eng.utah.edu/me4000wiki/index.php/MiniBaja1/HomePage