This manual serves as a comprehensive guide for the assembly of the steel bridge intended for competitive use. It includes detailed erection instructions, major components' locations and descriptions, and preventive maintenance checks. The manual features essential erection drawings, staging layouts, and a summary of required materials and tools. Specific attention is provided to the order of assembly, crew requirements, and handling temporary piers. A thorough breakdown of components ensures smooth construction across all phases.
E N D
Chapter 6Erection Manual Format To replace “Construction Specifications”
Primary Sections 6.1 GENERAL INFORMATION 6.2 LOCATION AND DESCRIPTION OF MAJOR COMPONENTS 6.3 ERECTION INSTRUCTIONS
6.1 GENERAL INFORMATION 6.1.1 Scope: This manual provides the assembly instructions for the steel bridge for use in the competition.
6.2.1 Erection drawing • Showing order in which members and/or assemblies are added to the evolving bridge.
6.2.2 Assembly drawings • Showing the order in which individual members are added to create the assemblies, if any. Sheet 1 with numbers/letters and sequence.
6.2.3 Summary of members, equipment, hardware, and tools to include quantity • Members • Nonfabricated items such as bolts, nuts, hardhats, goggles, aprons etc. Sheets 2-3.
6.3.1 Preventive maintenance checks • Recheck rule sizes and weight of components • Inspect components for damage Sheets 4-6.
6.3.2 Staging layout • Include all members, equipment, tools, hardware, temporary piers Sheet 7.
6.3.3 Work party required • How many people? • How many barges? • Crew member designations
6.3.4 Erection • Who, What, When, How ? • All members, assemblies, equipment, and tools must be indicated in Section 6.2. • Note location of any temporary piers. Sheets 8-20.
6.3.5 Breakdown Sheets 21-26.