An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PROJECT • Operation and Maintenance of theConvention Center of Lima (Centro de Convenciones de Lima) • February 2016

  2. Lima Centro de Convenciones (LCC) • Location : Centro Cultural de la Nación, Av. Arqueología esq. Av. Del Comercio - District of San Borja. • Area: 85,441.39 m2. • Capacity: 9,950 persons • Status: Currently in construction by the company Constructora OAS S.A. Branch of Peru. • Total investment : S/. 534,841,943.23 ( SNIP Code N° 269264) includes the technical file, infrastructure, technology, furniture, equipment and supervision. • Culmination: was concluded before the Annual Meeting of Governors of the World Bank and the International Monetary Fund (October 2015), held in the city of Lima.

  3. Description of Infrastructure CONFERENCE ROOMS: • Level 1: 2 rooms of 1,800 m2 e/o – 1200 persons. • Level 4: 2 rooms of 750 m2, 1 room of 225 m2, 1 room of 150 m2, 2 rooms of 300 m2 , 2 rooms of 450 m2. • Level 5: 1 room of 150 m2 , 1 room of 225 m2. • Level 6: 2 rooms of 750 m2, 1 room of 150 m2, 1 room of 225 m2, 1 room of 450 m2. • Level 8: Plenary room 5,250 m2. Total area : 14,925 m2 Total quantity of persons : 9,950

  4. Description of Infrastructure LOWER LEVELS : • Basements 1, 2, 3 and 4: 4 underground levels of parkings for 945 units. • Truck parking : loading and discharge dock. OUTSIDE • Private bus stop (in square of Culture).

  5. Description of Infrastructure OTHER SPACES: • Translation booths (Level 2, 5, 6, 7 and 9) • Waiting rooms (Level 1, 2, 4, 6, 8 and 9) • Administrative area (Level 3 and 7) • Coffee shop (Level 3) • Platforms green area (Level 5, 6, 8 and 10) • Recreation (Level 5) • Restaurant (Level 5) • Cuisine (Level 5 and 7) • Warehouse (in all levels)

  6. Lima Centro de Convenciones (LCC) • High technology. • Converged system of communications. • Wifi for 10,000 simultaneous connections. • Support connectivity for audio visual. • Possibility of simultaneous events.

  7. Location of the Project CULTURAL CENTER OF THE NATION LCC

  8. Main Characteristics of the Process Public Investment : Executed Design Construction Financing Lima Convention Center (Centro de Convenciones de Lima) (LCC) El Proyecto Operation Maintenance Private Investment : To be implemented Referential Video : https://www.youtube.com/watch?v=YaJ20-ascsk

  9. Main characteristics of the Process

  10. Main characteristics of the Process