1 / 3

Plenary Strategy and Planning

Plenary Strategy and Planning. Dr. Jonathan Raab, Facilitator MA DG Working Group June 28, 2012. Plenary Plan. Plenary #3 (June 28) Review and Complete Options Matrix Plenary #4 (July 12) Learn about other states Prioritize Options Matrix Plenary #5 (Aug 1)

owen
Télécharger la présentation

Plenary Strategy and Planning

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Plenary Strategy and Planning Dr. Jonathan Raab, Facilitator MA DG Working Group June 28, 2012

  2. Plenary Plan • Plenary #3 (June 28) • Review and Complete Options Matrix • Plenary #4 (July 12) • Learn about other states • Prioritize Options Matrix • Plenary #5 (Aug 1) • Develop Package Solution Options

  3. Assignment for Plenary #4 (July 12) • Review literature on other states • CA Settlement • NREL Screens Report • PG&E/SCE Clustering • SEIA FERC Filing • Freeing Grid and KEMA Report (Prior HW assignment) • Prioritize Options in Matrix • Preferred option(s) for each design component (e.g., each row) • Options you can potentially accept as part of package • Options can’t likely accept (i.e., bad ideas)

More Related