An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Facilities Information Management System(FIMS) Data ValidationInbriefprogram Facilitiessite name date

  2. Agenda • Introductions • Objective • Measure of Success • Validation Process • FIMS Data Elements and Performance Measures Reviewed • Schedule • Rating Charts • Deliverables • Issues/Questions

  3. Introductions • Validation Team • Name, Organization • Name, Organization • Name, Organization

  4. Objective • Gage the robustness of the FIMS data • Validate that asset data is being identified and captured correctly in FIMS • Confirm a 90% confidence level of accuracy of the asset data • Generate recommendations for FIMS data improvement • Macro-Level • Federal Real Property Council (FRPC) data requirements • The Department’s financial reports • Micro-Level • Transfer validation technique to sites • Support Site Facility Improvement Programs • Enhance TYSP development

  5. Measure of Success • We will be successful if we • Review/validate a statistically random set of FIMS owned building/trailer/OSF assets • Review/validate 100% of all DOE leases • Review/validate no more than 25 land assets • Generate either agreement (or documented disagreement) why a specific element in a FIMS record is accurate or inaccurate • Walkthrough a set of the random buildings/trailers/OSF and examine condition and utilization • Understand how FIMS data is being maintained and managed • Document other notable facts and data • Develop recommendations to correct any identified deficiencies

  6. Validation Process • Paper review of a random sample of owned records, DOE lease records and land records • FRPC data elements in FIMS • Other FIMS data elements • Review of source documents comparing source document values with FIMS values • Other review procedures • Perform limited building/trailer/OSF walkthroughs • Interview / discussions with FIMS and CAIS administrators • For sites that have bridges, verify bridge safety inspections meet required inspection frequencies

  7. FIMS Data Elements and Performance Measures Reviewed For DOE Owned Assets • Ownership • Usage Code • Property Type • Status • Size • Gross Sqft (buildings and trailers) • Primary Qty/ Secondary Qty (OSF) • Utilization(buildings and trailers) • Replacement Plant Value • Deferred Maintenance • Operating Cost (site level)and Annual Actual Maintenance(asset level) • Mission Dependency • Historic Designation • Using Organization • Main Location • Location City/State/County/Zip Code • Location Congressional District • Excess Indicator • Estimated Disposition Year • Total No of Federal Employees (buildings and trailers) • Total No of Contractor Employees (buildings and trailers) • Total No of Other Personnel (buildings and trailers) • Total No of Occupants (buildings and trailers) • Outgrant Indicator • Cool Roofs (buildings and trailers) • Sustainability (buildings and trailers) • Meters GREEN– Performance Measures

  8. FIMS Data Elements and Performance Measures Reviewed For DOE Leased Assets • Ownership • Usage Code • Property Type • Status • Size • Gross Sqft (buildings and trailers) • Primary Qty/ Secondary Qty (OSF) • Utilization(buildings and trailers) • Replacement Plant Value • Annual Actual Maintenance • Mission Dependency • Using Organization • Main Location • Location City/State/County/Zip Code • Location Congressional District • Estimated Disposition Year • Total No of Federal Employees (buildings and trailers) • Total No of Contractor Employees (buildings and trailers) • Total No of Other Personnel (buildings and trailers) • Total No of Occupants (buildings and trailers) • Outgrant Indicator • Cool Roofs (buildings and trailers) • Sustainability (buildings and trailers) • Meters • Expiration Date • Annual Rent • Lease Authority GREEN– Performance Measures

  9. FIMS Data Elements and Performance Measures Reviewed For Land Assets • Ownership • Usage Code • Property Type • Status • Size • Acreage (Urban + Rural) • Annual Actual Maintenance(asset level) • Mission Dependency • Historic Designation (owned only) • Using Organization • Main Location • Location City/State/County/Zip Code • Location Congressional District • Excess Indicator • Estimated Disposition Year • Outgrant Indicator • Expiration Date (leases only) • Annual Rent (leases only) • Lease Authority (leases only) • Acquisition Method • Year Acquired GREEN– Performance Measures

  10. Schedule • Tuesday (replace with appropriate day) • Inbrief • Extract data from FMIS to be validated • Desktop validation for DOE owned, DOE leased and Land assets • Review bridge safety inspection records, if applicable • Arrange walkthroughs • Wednesday (replace with appropriate day) • Complete desktop validation • Perform walkthroughs • Finalize validation forms and Scorecard • Outbrief

  11. Data Element Rating System • A variance is the difference between the FIMS value and the value of the source document. • Material Variances are a difference of 10% or more for numeric data or any difference for non-numeric data. • Red, yellow and green ratings are assigned to each data element based on the frequency of material variance in the random sample: • RED>10% frequency of material variance • YELLOW >5% frequency of material variance but no more than 10% frequency of material variance • GREEN– 5% or less frequency of material variance

  12. Rating of Status • An overall Status rating of RED is received if: • One or more of the performance measures result in a red status • Or, two or more of the other data elements are red • Historic designation, property type, status, etc. • A rating of YELLOW is received if: • Any performance measure is yellow • Or, any one data element is red • A status rating of GREEN is received if: • All performance measures are green • And no red data elements Performance Measures: RPV, Deferred Maintenance, Utilization, Operating Cost (site level) and Annual Actual Maintenance

  13. Rating of Progress • RED– indication that red status will not improve or yellow status will decline • Lack of attention and urgency • Corrective action plan not being met • YELLOW– indication that limited, positive efforts are being taken that may improve the data • Insufficient attention being given • Corrective action plan in place but progress is slipping • GREEN– results-oriented plan in place with goals and necessary resources • Clear level of attention and demonstrated sense of urgency • Frequency of material variance is going down • Typically, a site that is green in status by default is green in progress

  14. Deliverables • One Scorecard report of key findings / recommendations for DOE owned buildings/trailers/OSF’s • One Scorecard report of key findings / recommendations for DOE leased assets (if applicable) • One Scorecard report of key findings / recommendations for Land leased assets (if applicable) • Discussion of next steps

  15. Inbrief Issues / Questions?