Construction Progress Report

Construction Progress Report. Construction Progress Report – October 19, 2011. Arial View of Entire Property. Cage / Players’ Services. High Limit Slots. Back of House – Human Resources Training Room. Back of House - Table Games Training Room. Back of House - Office Area.

patia
Télécharger la présentation

Construction Progress Report

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Construction Progress Report

  2. Construction Progress Report – October 19, 2011

  3. Arial View of Entire Property

  4. Cage / Players’ Services

  5. High Limit Slots

  6. Back of House – Human Resources Training Room

  7. Back of House - Table Games Training Room

  8. Back of House - Office Area

  9. Back of House – Wardrobe Desk

  10. Back of House – Static Flooring Installation in Computer Room

  11. Pouring of Sidewalks / Walkways

  12. Northeast Corner Exit – Forms for Stairs

  13. Loop Road Hardscaping/Landscaping

  14. Construction Progress Report – October 19, 2011Four Week Look Ahead • Casino Interior: • Arrival/installation of permanent chiller units; • Installation of kitchen equipment to begin; • Installation of drywall ceiling and soffits at main promenade; and • Continuation of metal stud walls and interior rough-ins. • Casino Exterior: • Installation of landscaping; and • Continuation of exterior finish insulation system on north walls. • Parking Garage: • Initialization of electrical distribution; • Installation of masonry stair shafts; and • Demobilization of tower cranes. • Road Work: • Continuation of Miami Street widening efforts on south side; and • Installation of infrastructure for new traffic signals.