1 / 23

Determining the Significant Aspects

Determining the Significant Aspects. EPA Regions 9 & 10 and The Federal Network for Sustainability. Objectives. After this discussion, you should : Describe the importance of significant environmental aspects for your EMS.

patty
Télécharger la présentation

Determining the Significant Aspects

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Determining the Significant Aspects EPA Regions 9 & 10 and The Federal Network for Sustainability

  2. Objectives After this discussion, you should : • Describe the importance of significant environmental aspects for your EMS. • Describe factors to consider in evaluating the significance of environmental aspects and impacts.

  3. Overview • Definition • EMS Requirements • Risk Assessment • Decision Matrices

  4. Definition • A significant environmental aspect is an environmental aspect that has or can have a significant environmental impact. • Significance could be tied to: • Environmental concerns • Natural resource concerns • Regulatory or legal exposure • Business or mission concerns • Concerns of interested parties

  5. EMS Requirements • ISO 14001 uses “significant” aspects and impacts as the basis for developing objectives and preparing programs. • The facility determines which aspects and impacts are “significant.” • The EMS must address all significant aspects.

  6. Considerations for Determining Significance • Legal and other requirement • Toxicity • Consequence / Magnitude • Risk / Likelihood • Sustainable • Others

  7. Several Methods for Determining Significance • Risk Assessment • Decision Matrices • Significance Set by Management

  8. Risk Assessment • Risk assessment is a tool used by managers to provide information for decision making. • Risk assessment may be formal or informal, but it is always there.

  9. Risk Management • Risk management addresses unacceptable risk. • Residual risk is the unidentified risk plus any acceptable, identified risk remaining after risk management.

  10. Characterizing Risk • Exposure - How big of a problem is it? • Global, regional, local? • Severity - How bad will it get? • Probability - How likely is it to occur? • Daily, weekly, monthly, annually, in emergencies, only when a certain event happens, when a new project starts?

  11. Risk Assessment • Estimate exposure, severity, and probability for each aspect • Prepare relative rank for each aspect • Compare ranking to determine significance

  12. Aspect Exposure Severity Probability Total Vehicle exhaust 4 2 3 24 Hazardous waste 1 4 2 8 Food waste 3 1 2 6 Risk Assessment Example Not real data. Scale of 1 to 5 used with 1 being low and 5 high. Numbers were multiplied to give totals. No weighting factors used.

  13. Decision Matrices • A decision matrix is a tool used to quantify a risk assessment • Identify key criteria • Determine relative ranking • Evaluate significance

  14. Key Criteria for Significance • Environmental impact • Health & safety • Regulatory or Executive Order requirement • Cost • Mission impact • Environmental policy commitments • Community impact

  15. Decision Matrix Example Aspect Env.Imp H&S Cost of Mission Comm. Total Change Vehicle 3 2 - 1 1 3 8 exhaust Hazardous 4 3 - 2 2 2 9 waste Food 1 1 - 1 1 1 3 waste National data. Scale of 1 to 5 used with 1 being low and 5 high. Numbers were added to give totals. No weighting factors used.

  16. Significance May Be Defined by Management • Environmental Goals • Management Priorities

  17. Risk Assessment and Decision Matrices are only suggestions Refer to your agency’s risk management procedures Establish a procedure and stick with it Make a list of significant aspects and the impacts associated with them Determining Significance

  18. Where Do Significant Aspects Fit in Your EMS? • EMS manages your significant aspects, impacts • Objectives and targets for your significant aspects shall be considered • Employees need to be aware of significant environmental aspects of their jobs • Organizations shall consider processes for external communication of significant aspects and document decision • Organization shall have procedures to monitor operations & activities that can have signif. impact(s)

  19. Summary • Significant aspects are defined based on facility-specific criteria • A formal procedure is used to evaluate significance • Preparing a list of significant aspects is a big part of an EMS

  20. Exercise 4: Determining significant Aspects Use reproducible methodology; e.g., rank using a formula containing factors the organization considers important • Potential factors • severity • probability/frequency • risk (environmental/ • health/financial) • toxicity • external concerns • ability to control/ • influence/investigate • duration • regulatory concern

  21. Examples of Factor Ratings • Severity • 5 Catastrophic • 4 High • 3 Moderate • 2 Low • 1 Slight • 0 Positive Impact • Regulatory Importance • 5 Current violation • 4 Non-compliance, past 3 yrs • 3 Non-compliance, past 5 yrs • 2 In compliance • 1 Below regulatory cut-off • 0 Unregulated

  22. Examples of Factor Ratings • Probability • 5 Certainty • 4 Likely • 3 So/So • 2 Unlikely • 1 Very unlikely • Potential for Increased Control • 5 High, with cost savings • 4 High at low cost • 3 Moderate • 2 Low • 1 Low and very costly

  23. Example of Rating Scheme • Significance = • (Severity + RI + Prob) Control

More Related