1 / 8

NOAA/NSSL Activities

NOAA/NSSL Activities. Kurt Hondl , NSSL MPAR Project Manager OFCM MPAR Working Group Meeting 20 September 2012. NWRT Phased Array Radar. Operational Status Install UPS before the end of the year Ongoing maintenance issues with A/C units Software Development Activities

pearl-brock
Télécharger la présentation

NOAA/NSSL Activities

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NOAA/NSSLActivities Kurt Hondl, NSSL MPAR Project Manager OFCM MPAR Working Group Meeting 20 September 2012

  2. NWRT Phased Array Radar • Operational Status • Install UPS before the end of the year • Ongoing maintenance issues with A/C units • Software Development Activities • Added auto PRT algorithm to minimize range folding • Based on whole 90 deg sector or tracking box • Improvements to Adaptive DSP Algorithm for PAR Timely Scans (ADAPTS) spatial surveillance mode • Technology Developments • Implemented long pulse capability NOAA/NSSL Activities Update

  3. NWRT/PAR Data Collection • Supported 3 Experiments (through June 30th) • Deep Convective Clouds and Chemistry (DC3) • Severe Outbreak • MPAR Wind Shear Detection Capability Assessment Experiment • GOES-14 Rapid Scan Project • Collected NWRT/PAR data while GOES-14 satellite was doing 1-minute high resolution updates over the Oklahoma domain • Phased Array Radar Innovative Sensing Experiment • 6 pairs of journeyman & expert forecasters (June-August) • Evaluate the impact of high temporal resolution radar data on the warning decision-making process • Analysis of results just beginning NOAA/NSSL Activities Update

  4. MPAR Program Activities • Basic Commerce & Industries/Lockheed Martin Panel • Fabrication of dual polarization panel was delayed • Scheduled for fabrication by the end of September • FAA Reimbursable Agreement • Statement of Work signed & money transferred • Continued collaboration on Risk Reduction Activities • MIT/Lincoln Laboratory Demonstrator • SOW signed to develop MPAR 10-panel sub-array demonstrator • Year 1 funds design and fabrication • OU Atmospheric Radar Research Center (ARRC) • Cylindrical Polarimetric Phased Array Radar (CPPAR) • Integrating OU/ARRC backend technology with MIT/LL panel • Kick-off meeting in August NOAA/NSSL Activities Update

  5. Dual Polarization R&D • Risk Reduction Activities • 1) MIT/Lincoln Laboratory • Patch/Patch antenna design • Currently fabricating Gen 2 panel • Gen 2+ 10-panel sub-array funded • 2) BCI/Lockheed Martin • Patch/Dipole antenna design • Fabrication scheduled September 2012 • 3) OU/Atmospheric Radar Research Center • Cylindrical Polarized Phased Array Radar MIT/LL Gen 1 panel OU/ARRC CPPAR NOAA/NSSL Activities Update

  6. NOAA OAR/NWS Joint Activities • OAR/NWS Coordinated Activities • Engaged in radar requirements analysis • Notional Functional Requirements for RFI • Preliminary requirements needed for IARD participation • Joint briefing for NWS/OAR leadership (Oct 4th) • Interagency Radar Strategy NOAA/NSSL Activities Update

  7. 3D Iso-Surface Display 20 dBZRefl 60 dBZRefl 0.01 s-1AzShear NOAA/NSSL Activities Update

  8. 3D Iso-Surface Display 30-min Animation 20 dBZRefl 60 dBZRefl 0.01 s-1AzShear NOAA/NSSL Activities Update

More Related