An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Activity during test run Zoltán Fodor Wigner Research Centre for Physics, Hungarian Academy of Sciences

  2. Main goals: Check the functionality of all possible parts. TPC Total readout and data taking with Kr source Needed full gas and HV settings, readout, … New pulser system test TOF Only readout check is possible, full readout and processors must be switched on Get running the laser signal and check the channels, /could be with the start with laser diodes?/.

  3. DCS All connectivity must be checked BPD Readout check HV stability test? LMPD Readout test Kr? Beam counters S11 needed for trigger, others checks for working

  4. DAQ • Test the functionality • Connection to all subsystem /TOF, CAMAC, trigger, DCS, …./ • Trigger • The trigger logic could be tested with S11 start signal • Magnet • We can not switch on because cooling ready only later

  5. PSD • Readout test

  6. Schedule • Setup and DAQ test Sept. 1-14 • Kr run • VTPC1 Sept. 15 • VTPC2 Sept. 16 • MTPCR Sept. 17 • MTPCL Sept. 18 • GTPC Sept. 19 • LMPD Sept. 20