1 / 14

O’Hare Airfield Configuration

O’Hare Airfield Configuration. EXISTING Airfield Configuration. FUTURE Airfield Configuration. North Airfield Project Layout (by Contract). NEW PERIMETER ROAD & FENCING. MT. PROSPECT RD. / GUARD POST 1 RELOCATION. R/W 9L-27R PAVEMENT & ELECTRICAL. R/W 9L-27R SITE PREPARATION.

Télécharger la présentation

O’Hare Airfield Configuration

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. O’Hare Airfield Configuration EXISTING Airfield Configuration FUTURE Airfield Configuration

  2. North Airfield Project Layout(by Contract) NEW PERIMETER ROAD & FENCING MT. PROSPECT RD. / GUARD POST 1 RELOCATION R/W 9L-27R PAVEMENT & ELECTRICAL R/W 9L-27R SITE PREPARATION R/W 9L-27R NAVAIDS 90" JAWA WATER MAIN RELOCATION (a) 90" JAWA WATER MAIN LINE STOP (“HOT TAP”) DES PLAINES LAND ACQUISITION AREAS ELK GROVE LAND ACQUISITION AREAS (c) (b) LLWAS EXPANSION / RELOCATION 4 North Airfield Locations NORTH BASIN PUMP STATION NORTH AIRFIELD ASR-9 (a) RTR – P (b) RTR – Q (c) NORTH AIRFIELD ARFF SERVICE ROAD AIRFIELD VAULTS & ASSOCIATED DUCT BANKS (combined w/South) 14L THRESHOLDDISPLACEMENT AMERICAN AIRLINES PARKING LOT RELOCATION NORTHAIRPORT TRAFFIC CONTROL TOWER (NATCT) Contract Awarded Under Construction Contract Completed

  3. South Airfield Project Layout(by Contract) R/W 10L PAVING & ELECTRICAL R/W 10L MASS GRADING R/W 10L NAVAIDS R/W 10C-28C CARGO TUNNEL EXTENSION CARGO TUNNELS & TAXIWAY 45 R/W 10L TAXIWAYS R/W 10C-28C MASS GRADING & CONSTRUCTION (CENTRAL) R/W 10C-28C PAVING & ELECTRICAL (EAST) & R/W 10C-28C NAVAIDS (c) R/W 10C-28C PAVING & ELECTRICAL (WEST) 10C BERMS 5 AND 6 & 10L SITE PREPARATION (a) R/W 10C-28C MASS GRADING (EAST) CARGO APRON (c) (b) SOUTH BASIN SITE PREPARATION (d) BENSENVILLE LAND ACQUISITION AREAS SOUTH RTR’SR & S and LLWAS LLWAS (a) RTR – R (b) RTR – S (c) (b) AIRFIELD VAULTS & ASSOCIATED DUCT BANKS (combined w/North) 10C-28C CARGO AREA SITE PREPARATION SOUTH SERVICE ROADS FEDEX CARGO BUILDING UNITED CARGO BUILDING BENSENVILLEDITCH RELOCATION ALTERNATE BENSENVILLEDITCH RELOCATION FUELING SYSTEM REPLACEMENT Contract Awarded Under Construction Contract Completed INTERIM RAIL RELOCATION & CARGO ACCESS RD RAILROAD RELOCATION (4 Packages) RAILROAD METRA SOUTH (a) RAILROAD INTERSECTION SOUTH TO METRA (b) RAILROAD INTERSECTION NORTH (c) RAILROAD INTERSECTION GRADE SEPARATION (d) (a)

  4. Work in Progress Photography:10C Berms 5 & 6 and 10L Site Prep Berms 5 and 6 facing Northeast. Berms 5 & 6 facing North. Compacting asphalt grindings for bituminous paving of proposed service road. Irving Park Road berm facing South.

  5. Work in Progress Photography: South Basin Site Prep Placement of concrete pavement for Taxiway ZJ. Phase 1B - Taxiway ZJ tie in. Finishing of concrete pavement for Taxiway ZJ. Replacement of 66" Stormsewer above Stormsewer System 1H.

  6. Work in Progress Photography: 10L Mass Grading Excavating for CED Manholes facing South. South face of Berm 3. Crane at Jacking Location 3. CED Manholes installed facing Northwest.

  7. Work in Progress Photography: 10C-28C Mass Grading Overall view of existing South Basin. Preparation of construction ramps. Stripping topsoil for storm sewer installation. Embankment of construction ramps for access to Stormsewer Systems E & F.

More Related