An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PACT Deliverable D2.1 • Part1: Housing and energy services Wolfgang Eichhammer (presentation) Martin Jakob

  2. Task T2.1 Assessment of technologies to achieve a post-carbon society • Objectives of Task T2.1 : linkage between urban schemes , structure of housing and construction, transport and energy infrastructures, and materials ; feed-up related inputs for VLEEM and POLES • Issues to be covered: Assessment of technologies for • housing, renewables, vehicles,…in post carbon urban schemes with related micro quantification of material demand for housing and transport, decentralised renewables, etc (Fraunhofer) • supplying mobility and energy services with related micro quantification of material for transport and energy production, large scale renewablescaptation, etc (Fraunhofer, Enerdata) • Dl 2.1 First report on T2.1: • Technology description of current technologies in the housing, transport and energy system

  3. Technology description of current technologies Goals • Micro-quantification of (bulky) materials (unit requirements) • Dependency between bulky material needs and energy-efficiency of buildings (standards not yet explicitly presented) • Demolition/replacement of existing buildings vs. add-on retrofits • Identify potential to save energy-intensive materials (including material substitution) by adjusting construction practice and concepts

  4. Context:residential building stock (EU27) • Floor area in Mio m2 Total: 6’910 Total: 11’130 Old Intermed. Recent New (2006-2008) Old Intermed. Recent New (2006-2008) Single-family houses Multfamily houses

  5. Overview: aggregated material needDifferent order of magnitude Construction (Envelope and structure): 850 MTonnes/a , cement Heating systems: 20 MTonnes/a , sand Appliances: 1.1 MTonnes/a

  6. Example Outer walls: Break down of specific material need [kg/m2]

  7. Example Windows (new and replacement):specific material need [kg/m2]

  8. Construction (envelope and structure):Overall material need [MTonnes/a]

  9. Construction: Breakdown of overall material need by type of building component Bricks Concrete Metals Timber Thermal Insulation Coating (plaster, mortar… Glass Others (plastic, …

  10. Retrofit of existing buildings:overall material need [MTonnes/a] • Retrofitusuallyis an add-on measure • Buildingstructureusuallyremainsunchanged • Material isneededonlyforinsulation, coating/plasterand glas • Exception: bricks in thecaseofroofs

  11. 10-15kW heating system:Specific material need [kg/unit] • Generally: mainlymetals • Oil, wood (pellets): also concrete (spaceforenergystorage) • Distribution systemstobeadded (havebeenevaluated)

  12. Appliances:Specific material need [kg/appliance] • Appliances: relevant aremainlymetalsandplastics

  13. Overview: aggregated material needPro memoria: Different order of magnitude Construction (envelope and structure): 850 MTonnes/a • Bulky materials: building envelope and structure • Concrete most relevant material • Concrete used in base plate, base wall, ceiling, flat roof (and also walls) • Bricks used in interior walls, also walls and roofs (tiles) Heating systems: 20 MTonnes/a , cement Appliances: 1 MTonnes/a , sand

  14. Conclusions Dl2.1 • Mostly weak dependency between bulky material needs and energy-efficiency of buildings (Exception: Massive construction vs. light weight construction only for energy-efficiency reason to be checked) • Bulky materials: net new or demolition/replacement of existing buildings (add-on retrofits have low relevance) • Distinct differences between different construction types (e.g. concrete, brick, wood structure) • Potential to save energy-intensive materials by adjusting construction practice and concepts: • Frame structure or piles instead of massive bricks and concrete (still needed for base plate and base wall though) • Avoid cavity walls, use exterior insulation instead

  15. From here: Back up slides

  16. Example Roofs:specific material need [kg/m2]

  17. Interior walls:specific material need [kg/m2]

  18. Construction elements: Assumptions on lifespan and replacement rates

  19. Building technology elements: Assumptions lifespan and replacement rates

  20. Building technologies:Total material use [MTonnes/a] • Bulky material needtoprovide „shelter“ forheatingsystem (spaceforheatingsystemand tank; chimney) • Also relevant: metals (andplastics/insulationmaterials)