phelan-franklin
Uploaded by
24 SLIDES
501 VUES
241LIKES

Work Breakdown Structure WBS

DESCRIPTION

Work Breakdown Structure WBS. Lôùp Boài döôõng kieán thöùc vaø kyõ naêng quaûn lyù döï aùn xaây döïng. Taøi lieäu löu haønh noäi boä Bieân soaïn & giaûng: Trần Trung Hậu, M.Eng. Work Breakdown Structure (WBS).

1 / 24

Télécharger la présentation

Work Breakdown Structure WBS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript

Playing audio...

  1. Work Breakdown StructureWBS Lôùp Boài döôõng kieán thöùc vaø kyõ naêng quaûn lyù döï aùn xaây döïng Taøi lieäu löu haønh noäi boäBieân soaïn & giaûng: Trần Trung Hậu, M.Eng

  2. Work Breakdown Structure (WBS) • Laø moät heä thoáng thöù baäc maø trong ñoù caùc phaàn töû lôùn hôn ñöôïc phaân chia thaønh caùc phaàn töû nhoû hôn • Ñôn vò nhoû nhaát cuûa WBS laø goùi coâng vieäc (Work Package).

  3. CÔ CAÁU PHAÂN CHIA COÂNG VIEÄC: WORK BREAKDOWN STRUCTURE (WBS) • Laøm giaûm caùc quaù trình thi coâng phöùc taïp thaønh nhöõng chuoåi nhieäm vuï maø töø ñoù coù theå hoaïch ñònh • WBS trình baøy moät quaù trình thi coâng trong moät daïng thöùc cuûa thöù baäc theo muïc ñích, muïc tieâu vaø caùc coâng taùc • Nhaän daïng caùc coâng taùc maø phaûi ñöôïc hoaøn thaønh töø luùc baét ñaàu ñeán luùc keát thuùc döï aùn • Laø neàn taûng ñeå ñònh nghóa, hoaïch ñònh, toå chöùc vaø kieåm soaùt quaù trình thi coâng

  4. CÔ CAÁU PHAÂN CHIA COÂNG VIEÄC (WBS) • Caùc coâng taùc trong WBS ñöôïc phaân chia maõi cho ñeán khi toaøn boä quaù trình thi coâng ñöôïc hieån thò nhö laø moät heä thoáng cuûa caùc coâng vieäc rieâng bieät • Söï phaân chia cuûa caùc coâng vieäc seõ tieáp töïc maõi cho ñeán khi khoâng coøn söï choàng cheùo nhau giöõa caùc coâng vieäc

  5. CÔ CAÁU PHAÂN CHIA COÂNG VIEÄC (WBS) • Moãi coâng taùc neân: • Tình traïng vaø söï hoaøn thaønh döï aùn deå daøng ñöôïc ño löôøng • Coù thôøi gian hoaøn thaønh cuï theå thôøi ñieåm baét ñaàu vaø thôøi ñieåm keát thuùc. • Deå daøng öôùc löoäng chi phí vaø thôøi gian • Coù 1 muïc ñích deå hieåu vôùi moïi ñoái töôïng coù lieân quan • Traùch nhieäm cho söï hoaøn thaønh coâng taùc ñaõ ñöôïc phaân coâng roõ raøng

  6. 0.0 Project Goal 1.0 Objective 2.0 Objective Task 2.1 Task 2.2 Task 1.2 Task 1.1 Activity 2.1.1 Activity 1.1.1 Activity 1.2.1 Activity 2.2.1

  7. MOÄT VÍ DUÏ CUÛA WBS TRONG XD Caáp Work Breakdown Structure (WBS) Mieâu taû caáp ñoä 1 Nhaø kho Toaøn boä döï aùn 2 Ñieàu haønh Mobilization/ Demobilization Töôøng gaïch Coät theùp vaø caùc lieân keát Heä thoáng maùi Tieåu döï aùn 3 Chuaån bò maët baèng Neàn vaø moùng Saøn Töôøng gaïch Coät theùp & lieân keát Heä thoáng maùi Hoaøn thieän beân trong Loaïi coâng vieäc 4 Ñaøo moùng Vaùn khuoân & BT moùng Ñoå BT moùng Work Package 5 Lao ñoäng VLXD Thieát bò Taøi nguyeân

  8. WBS ñieån hình cuûa moät döï aùn xaây döïng

  9. WBS caáp 1: Toång theå döï aùn (caùc haïng muïc chính) • Phuïc vuï cho caùc toång giaùm ñoác, giaùm ñoác, phoù giaùm ñoác, • Cung caáp toång quan veà caùc haïng muïc chính cuûa moät döï aùn xaây döïng

  10. WBS caáp 2: Caùc haïng muïc phuïï • Phuïc vuï cho caùc tröôûng phoøng, tröôûng ban / nhoùm. • Cung caáp caùc haïng muïc chính vaø caùc haïng muïc phuï cuûa döï aùn xaây döïng

  11. WBS caáp 3: Caùc coâng vieäc • Duøng cho kyõ sö döï aùn, kyõ sö quaûn lyù taïi coâng tröôøng hoaëc ñoác coâng • Dieån taû chi tieát hôn veà caùc coâng vieäc cuï theå

  12. WBS ôû caáp 4: Caùc WP • Duøng cho toå tröôûng xaây laép, cai • Dieãn taû chi tieát caùc coâng taùc xaây laép

  13. CÔ CAÁU PHAÂN CHIA TRAÙCH NHIEÄM (OBS) • Dieãn taû söï phaân coâng traùch nhieäm cuûa töøng thaønh vieân. • OBS cuõng cho bieát ai seõ giaùm saùt ai

  14. GOÙI COÂNG VIEÄC (WORK PACKAGE) • Quy moâ cuûa coâng vieäc trong moãi goùi coâng vieäc neân ñöôïc ñònh nghóa ñeå phoøng traùnh söï truøng laép vaø söï boû soùt giöõa caùc goùi coâng vieäc • Caùc goùi coâng vieäc (Work packages) neân ñöôïc ñònh nghóa veà thieát keá, phöông phaùp thi coâng, yeâu caàu hoaøn thaønh, ngaøy hoaøn thaønh

  15. QUY MOÂ CUÛA WP Moãi goùi coâng vieäc neân laø : 1. Coù theå quaûn lyù • Quyeàn löïc cuï theå vaø traùch nhieäm cuï theå coù theå ñöôïc phaân coâng 2. Ñoäc laäp • Vôùi söï toái thieåu cuûa nhöõng caùi chung hoaëc söï phuï thuoäc vôùi caùc phaàn töû khaùc 3. Coù theå ño löôøng • Coù theå ño löôøng tieán trình.

  16. HEÄ THOÁNG CHI PHÍ CUÛA DÖÏ AÙN Caùc muïc tieâu cuûa vieäc thieát laäp heä thoáng chi phí cuûa döï aùn: 1. Duy trì chi phí xaây döïng cuûa döï aùn trong voøng ngaân saùch ñaõ thieát laäp 2. Khai thaùc thoâng tin veà naêng suaát lao ñoäng cuûa maùy moùc vaø thieát bò ñeå öôùc löôïng chi phí cuûa caùc coâng vieäc saép tôùi

  17. MAÕ HOÙA CHI PHÍ Maõ soá cuûa döï aùn Maõ soá cuûa vuøng Maõ soá phaân phoái Maõ soá cuûa kieåu coâng vieäc • Maõ soá chi phí cuûa coâng taùc thaùo vaùn khuoân cuûa saøn chung cö (Lao ñoäng). 0308D 05 03157.20 3

  18. MAÕ SOÁ CUÛA DÖÏ AÙN 0308D08 03157.20 3 • Döï aùn thöù taùm trong naêm 2003 (Daân Duïng)

  19. MAÕ SOÁ CUÛA VUØNG 0308D0803157.20 3 • Ñòa phöông maø döï aùn toïa laïc Hoaëc • Chi phí coù lieân quan ñeán caùn boä giaùm saùt hoaëc caùn boä quaûn lyù cuï theå

  20. Maõ hoùa kieåu coâng vieäc 9708B 0503157.203 03 Beâ toâng 0315 Vaùn khuoân 03157 Vaùn khuoân goã 03157.20 Vaùn khuoân goã cho coät 03157.30 Vaùn khuoân goã cho daàm

  21. Maõ hoùa söï phaân boå 9708B 05 03157.203 1. Toaøn boä 2. Vaät lieäu xaây döïng 3. Lao ñoäng (thöôøng goïi laø nhaân coâng) 4. Thieát bò 5. Thaàu phuï

  22. Maõ hoùa chi phí vaø Kieåm soaùt chi phí • Taát caû caùc khoaûn muïc chi tieâu ñöôïc tính vaøo döï aùn, nôi maø noù ñöôïc chi xaøi. • Khoâng neân duøng caùc taøi khoaûn ”Chung chung" or ”linh tinh”. • Maõ hoùa chi phí laø phuïc vuï cho muïc ñích cô baûn cuûa noù, noù phaûi ñöôïc hieåu vaø söû duïng thoáng nhaát bôûi toaøn boä nhaân vieân cuûa coâng ty/döï aùn.

  23. Haàu heát caùc nhaø thaàu laøm cho heä thoáng kieåm soaùt chi phí cuûa hoï phuø hôïp vôùi thôøi ñoaïn chi traû tieàn vaø phuø hôïp vôùi heä thoáng theo doõi thôøi gian cuûa hoï.

  24. CAÁU TRUÙC MAÕ HOÙA CUÛA MOÄT DÖÏ AÙN XAÂY DÖÏNG MAÕ HIEÄU DÖÏ AÙN (ID CODE) MAÕ HIEÄU WBS (WBS CODE) MAÕ HIEÄU KIEÅM SOAÙT (Control Code) MAÕ HIEÄU CHI PHÍ (Cost Code) Traùch nhieäm nhaø thaàu Kieåu taøi nguyeân Traùch nhieäm ñoác coâng Maõ soá Giai ñoaïn xaây döïng COÂNG TAÙC XAÂY LAÉP

More Related