Work Breakdown Structure

DESCRIPTION

Work Breakdown Structure. WHAT IS WORK BREAKDOWN STRUCTURE? WORK BREAKDOWN STRUCTURE DEFINES THE PRODUCT TO BE DEVELOPED OR PRODUCED BY HARDWARE, SOFTWARE, SUPPORT, AND/OR SERVICE ELEMENT, AND RELATES THE WORK SCOPE ELEMENTS TO EACH OTHER AND TO THE END PRODUCT. General Discussion of (WBS).

1 / 7

Download Presentation
Télécharger la présentation

Work Breakdown Structure

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Work Breakdown Structure • WHAT IS WORK BREAKDOWN STRUCTURE? • WORK BREAKDOWN STRUCTURE DEFINES THE PRODUCT TO BE DEVELOPED OR PRODUCED BY HARDWARE, SOFTWARE, SUPPORT, AND/OR SERVICE ELEMENT, AND RELATES THE WORK SCOPE ELEMENTS TO EACH OTHER AND TO THE END PRODUCT.

  2. General Discussion of (WBS) THIS PHASE OF PROJECT MANAGEMENT WOULD ASSIST IN PRIORITIZING OBJECTIVES & DUTIES. (WBS) GOES INTO GREAT DETAIL DISPLAYING AND DEFINING THE PRODUCT TO BE DEVELOPED OR PRODUCED. FRAMEWORK OF THE (WBS) DEFINES ALL CONTRACTUAL AUTHORIZED WORK .

  3. General Discussion of (WBS)Continued. A (WBS) IS DEVELOPED DURING THE PROPOSAL. EXAMPLE WOULD BE: AND ORGANIZATION GOING AFTER A GOVERNMENT CONTRACT. THE ORGANIZATION CLEARLY NEEDS SOME TYPE OF FORMAL PROPOSAL. NOTE- THERE ARE SOME INSTRUMENTS OUT IN THE MARKET THAT WOULD BE OF GREAT ASSISTANCE SUCH AS: MIL-STD-881 (LATES REVISED VERSION) THAT COULD BE USED AS A GUIDE.

  4. General Discussion of (WBS) Continued. THE (WBS) IS FIRST AND FOREMOST A TECHNICAL DATA GATHERING STRUCTURE, DEPLOYED SO THAT THE ACHIEVEMENT IN TECHNICAL PROGRESS CAN BE MEASURED AND ANALYZED AGAINST A FORMAL BASELINE PLAN. THE (WBS) AIDS THE CUSTOMER IN UNDERSTANDING THE STATUS OF THE PROJECT AS TIME ELAPSES. THE (WBS) AIDS THE CUSTOMER’S CUSTOMER IN UNDERSTANDING THE STATUS OF THE PROJECT.

  5. General Discussion of (WBS)Continued. INTENT OF (WBS) DEVELOPMENT IS TO KEEP PERFORMANCE MEASUREMENT REPORTING REQUIRING REQUIREMENTS AT A REASONABLE TECHNICAL DATA INFORMATION LEVEL USING COMMON SENSE. THE INDIVIDUALS ASSIGNED TO THE RESPONSIBILITY FOR DEVELOPMENT OF THE (WBS/CWBS) SHOULD CONCENTRATE THEIR EFFORTS ON PROPERLY DESIGNATING THE LOCATION OF EACH SEGMENT OF THE CONTRACTUAL WORK STATEMENT.

  6. Basic Rules Governing (WBS/CWBS) Development FOR GOVERNMENT CONTRACTS, USE MIL-STD-881 (LATEST VERSION) AS (WBS) DESIGN GUIDE. THERE CAN BE ONE AND ONLY ONE (1) (WBS) CONTRACT. THE CUSTOMER, NOT THE CONTRACTOR, IS THE PRIMARY OWNER OF THE (WBS) ONCE CREATED THE (WBS) WILL EXIST FOR THE LIFE OF THE CONTRACT. ONLY A FORMAL CONTRACT CHANGE WILL EFFECT A CHANGE IN THE (WBS).

  7. Work Breakdown Structure (WBS) Flowchart Phases