1 / 12

Princeton Plasma Physics Laboratory

Princeton Plasma Physics Laboratory. D&D of TFTR Health Physics Safety Radioactive Waste Keith Rule. Outline. Health Physics and Safety Approach Personnel assignments Equipment Final Survey Radioactive Waste Personnel Container requirements Transportation Disposal.

ping
Télécharger la présentation

Princeton Plasma Physics Laboratory

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Princeton Plasma Physics Laboratory D&D of TFTR Health Physics Safety Radioactive Waste Keith Rule

  2. Outline • Health Physics and Safety • Approach • Personnel assignments • Equipment • Final Survey • Radioactive Waste • Personnel • Container requirements • Transportation • Disposal

  3. Approach to Radiation Protection • Environmental Monitoring - Stack and site perimeter for particulate and tritium. • Facility Surveys - work areas, waste packaging, Mock-up, RWHF, adjacent facility areas. • Personnel Monitoring - bioassay, whole body count, digital dosimeters, whole body scan for beta gamma (when exiting work area). • Job Coverage and Monitoring - one HP per 4-5 workers (3 tasks simultaneously), exposure monitoring to tritium and gamma, surface monitoring. • Release of Equipment - scan for beta-gamma (no detectable), 1,000 dpm/100 cm2 for tritium surface contamination. (may change to 10,000 dpm/100cm2). • Radioactive Waste Characterization - smear for tritium by system and estimate surface area. Gamma survey on loaded containers for other radionuclides. • Containment - tents for diamond wire cutting using engineered ventilation. • Cutting - Baseline plan to cut all metals with shears except for VV. PF coils and pump ducts.

  4. HP Personnel Assignments • HP Manager - regulatory, instrumentation, and dosimetry support. • Health Physicist - (FTE) - Procedures, whole body counting, field support. • Lead Technician - (0.7 FTE) Supervision, procedures, RWPs, survey review. • 5 Field Technicians (FTE) • Count Room Technician • Compliance Surveys/Waste Support/Release • 3 Job Coverage • Dosimetry Supervisor - Bioassay, beta-gamma TLD, digital dosimetry. • Laboratory - DATS, Beta-gamma counting, gamma spec., oxidation. • Instrument calibration • Clerical (0.5 FTE) - record keeping, dosimetry support

  5. Safety Personnel Assignments • Site Industrial Hygienist - guidance and regulatory oversight - OSHA and NIOSH. • Assistant IH - (FTE) - training, procedures, permits, field sampling and monitoring. • Construction Safety - (FTE) field implementation of personnel safety. • Clerical (0.5 FTE) - record keeping, administration of permits.

  6. Equipment • Whole body counting - Helgeson • Exit monitoring for beta gamma - Helgeson, Aptec or Eberline • Tritium-in-air Monitors - Scintrex (2) • Bicron Micro-REM meters (4) • Beta-Gamma contamination survey meters (3) • Particulate air sampling - environmental and field (IH and HP) • Digital Dosimeters • General supplies - smears, vials, cocktail, etc. • Contamination Control - bags, herculite, decon equip. • Hearing, head, eye, and hand protection • Respiratory protection - lead handling

  7. Final Radiological Survey • Wall wipe down or wash (if necessary) • Surface Contamination Measurements • MARSSIM - • Walls, ceiling and floors • Radiation Surveys - characterize facility • Shot Blast Floors

  8. Radioactive Waste • 44,658 cubic feet of tritiated and activated material. • 20,833 cubic feet standard waste (B25 boxes) • 23,825 cubic feet special waste (non-standard or no packaging) • Maximum total activity due to activation is <100 Curies • Co-60, Co-57, Mn-54 • Fe-55 (beta emission only) • Total tritium inventory is 8,204 Curies • “Not active” inventory, entirely within VV. • Radioactive Waste Handling Facility • Storage of valuable equipment (primarily activated). • Storage prior to off-site transport for disposal. • Large items will be shipped directly off-site from TFTR through NE door.

  9. Waste Management Personnel • Waste Manager - coordinates all waste packaging, transportation and disposal. • Waste Technicians (2 FTE) - provide materials, monitor and assist with packaging. • Support - Mgmt, D&D Head, waste technicians, clerical, budget. • Mgmt - Regulation, DOE, Disposal facility • Head of D&D - Health Physics, safety, and rad waste • Waste Technicians - material handling, prepare for transport • Clerical - administration of legal documents related to burial • Budget - monthly tracking of ER/WM D&D Activities

  10. Container Requirements • 4 ft. wide, 4 ft. high, 6 ft long metal containers • IP- 1, IP-2, and Type A. • Type A have bolted closure. • 55 gallon drums - primarily for compactible and liquid waste. • Stainless steel kegs - tritiated oil • Special Containers • Vacuum vessel segments • RF pump ducts • No containers - TF coils, PF coils, columns and lintels • Material Recycle - stainless, copper and titanium • National Center for Recycle • Private industry

  11. Transportation • All shipments will be LSA or Type A quantities • Limited to 1080 Curies of tritium for Type A container • Dose rate limit of 200 mR/hr - no issues, VV at 50 mr/hr (May 1999). • Normal shipments - 40,000 lb. maximum payload • Special shipments • Vacuum vessel segments (10)- special permits (size and weight). • TF coils (20) - special permits (size and weight). • Current contract with TRISM - Expires April 2002 • Need to procure contractor for special transportation - logistics, permits, intermodal evaluation, bonding, heavy haul.

  12. Disposal • Hanford site for all disposal - Others are availablew/ DOE approval. • Cost estimates are based on $20 per cubic foot • High Integrity Containers - if >100 Curies/ cubic meter • No new waste streams are expected • Mixed waste - contingency but not expected (pump oil removed). • Scheduling July visit to Hanford - present D&D waste information. • Certain shipments will require special handling at Hanford • Vacuum vessel segments (10) - special permits (size and weight). • TF coils (20), PF coils, columns, lintels.

More Related