An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Stony Brook UpdateFurther Progress and Further Delay T.K. Hemmick for the Tent Crew

  2. Glovebox • Regen gas re-order: • Likely on Thursday. • Guaranteed Friday. • Arrived Monday • Regen started immediately upon arrival. • Glovebox had risen to ~35 ppm H2O meaning that our caution in closing off the detector was well founded.

  3. Webcasts • Installed camera in tent. • Can watch parameters remotely. • More to follow… Evaporator • GEMs still inside evaporator. • Vacuum fantastic (6 x 10-8 torr) • Ready when glovebox is ready. Dust • Borrowed dust meter and checked glovebox: • VERY clean (single digit countsin many minutes).

  4. Scintillation cube • GEMstack running well under dV=491 in test box. • Observed: • Alphas, • 55Fe • Scintillation Light • Further Measurement: • Nearly full containment of light in pad. • 1.5 p.e. per alpha is correct. • QE is a low (expected)

  5. LEGs Leak Tests • He leak chaser • Best sensitivity achievable • One HUGE leak at apressure relief valve. • Many small leaks • Likely irrelevant. • Repaired anyhow. • Leak free at the sensitivity of this device.

  6. Protection Panel Rebuilt • Matt and Jiayin rebuilt the panel: • Correct meter. • Labels on all functions. • Completely tested. • System will replace LEGs flow with a simple bottle & bubbler on over or under pressure. • Webcam coming…

  7. HBD West Leak Chasing • Three Results (w/o LEGs system): • Argon 4.8 flow: • Ultimate O2 = 12 ppm • Bottle = 4 ppm • Net = 8 ppm. • CF4 flow: • 30 ppm - ?? ppm (need to recheck). • He flow: • 0.0 ppm…weird… • CF4 sniffer is no more sensitive: • Saw no leaks. • Saw that the meter senses the exhaust at the same distance as did the old meter. • Purchased yesterday a “sniffer attachment” for our Helium Leak Chaser. • This will improve sensitivity by orders of magnitude.

  8. Guesses for West Leaks • The detector does leak some. • Helium Leak detector may finally be sensitive enough to see the leaks. • If not, we can resort to: • Replace the window (most likely place) • “Bag off” regions with N2 bags and watch for oxygen response. • We want to have these leaks sealed by middle of next week so that they do not become a schedule driver.