General Muon System Support Structures

Scope and Goals of the Review of the Muon Chamber and Electronics Support Structures: A basic concept has been developed in the past months, taking into account the requirements and the existing constraints -> Agreement on a baseline design is needed for further progress

Télécharger la présentation

General Muon System Support Structures

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Scope and Goals of the Review of the Muon Chamber and Electronics Support Structures: A basic concept has been developed in the past months, taking into account the requirements and the existing constraints -> Agreement on a baseline design is needed for further progress -> An action list towards the EDR/PRR of the support structures should be established, including suggestions on improvements of the present design General Muon System Support Structures Integration Meeting LNF

  2. M2-M5 Support structures Integration Meeting LNF

  3. Reviewers Recommendations Technical Issues – Muon Chamber and Electronics Support: • Only conceptual design has been presented and thorough engineering check is needed: “Structures are strongly hyper-static. Therefore an extensive engineering analysis is necessary, checking that under most severe combinations of positioning tolerances the structures have sufficient strength in terms of the expected stress- and deformation level, but also in terms of safety against buckling.” • Pivoting connections should be considered -> Much engineering and design work remains to be done! • EDR for Support structures should take place in Spring 2004 in order to have the structures ready for installation in 02/2005 Integration Meeting LNF

  4. Support Structures Progress since the review: Integration Meeting LNF

  5. Progress since the review Introduction of pivoting connections: vertical horizontal Integration Meeting LNF

  6. Progress since the review Modification of ground support: (using rails and rollers similar to filter chariots) Integration Meeting LNF

  7. Reviewers Comments General Comments: • Overall impression of the material presented at the review is very positive. Recommendations: • Define schedule in more detail • Strengthening of manpower resources • Options: • Add 6 months of a qualified designer • Base call for tenders on semi-functional technical specifications, leaving details of the design work to the suppliers -> Ferrara designers interested to join the project Integration Meeting LNF

  8. Schedule LHCC milestones: • Muon filter ready: 12/2004 • Support structures ready: 6/2005 Internal milestones: • PRR for chariots and their production drawings ready 6/2003 • PRR for filters and production drawings for tooling ready 11/2003 • EDR for chamber support structures 3/2004 • Production drawings for structures and tooling ready 6/2004 • Start of support structure construction 9/2004 Integration Meeting LNF

  9. Chamber Support Structure Dimensions • M1: Horizontal: +/-4000mm Vertical: +3350mm and -3400mm • M2: Horizontal: +/-5030mm Vertical: +4190mm and -4240mm • M3: Horizontal: +/-5410mm Vertical: +4500mm and -4550mm • M4: Horizontal: +/-5800mm Vertical: +4830mm and -4880mm • M5: Horizontal: +/-6180mm Vertical: +5140mm and -5190mm Integration Meeting LNF