BBMB Kewangan Berhad Performance, Availability/Recovery and Support Recommendations Presentation to EXCO 16 July 1997 BBMB KEWANGAN Bh. Agenda • Performance Management Strategy • Availability/Recovery Strategy

primo
Télécharger la présentation

BBMB Kewangan Berhad Performance, Availability/Recovery and Support Recommendations

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. BBMB Kewangan Berhad Performance, Availability/Recovery and Support Recommendations Presentation to EXCO 16 July 1997 BBMB KEWANGAN Bh

  2. Agenda • • Performance Management Strategy • Availability/Recovery Strategy • — Interruption/Disaster Architecture — Contingency Planning Program — Emergency Operations Teams — Application Release Procedure — Other Availability Elements • • Help Desk Approach • Recommendations

  3. Recommended Performance Management Strategy • Measure UNIX Host Production System Performance • ON-LiNE PERFORMANCE - 95% in 3 seconds committed • (Method: Insert time stamp into test transactions) • - Need 8 Transactions per Second • Committed 10 transactions per Second • BATCH PERFORMANCE • (Method: Development System Drives Data into the Production System) • - Need & Committed End-of-Day in 5 Hours - Need & Committed End-of-Month in 7 Hours

  4. Recommended Performance Management Strategy (Continued) • Measure Branch System Response Time- 95% in 2 seconds committed • (Method Insert time stamp into test transactions) Workstations will create transactions at maximum teller input rate • Measure Network Response Time - 95% in 2 seconds expected • (Method: Insert time stamp into test transactions) • High volume branches will create transactions at maximum branch system throughput

  5. Responsibility for Performance Testing • UNIX Host Production System - Executing - Monitoring and review • Branch Systems - Executing - Monitoring and review • Network - Executing - Monitoring and review Sanchez & DEC BBMBK DEC BBMBK DEC & Telékom BBMBK

  6. Recommended Availability/Recovery Strategy • • Interruption/Disaster Recovery Program • - Architecture - Contingency Plunning Program (Disaster) - Restart Training (Interruptions) • • Hardware/Systems Software Program • - Data Center Maintenance & Escalation - Branch Systems Maintenance & Escalation • • Application Architecture Program • - Application Release Procedure - Restart Training (Interruptions) - Application Architecture Review

  7. Interruption/Disaster Architecture

  8. Contingency Planning Program • • Backup Site Contract • Decision & Notification Procedure • Team Structure & Membership • Operational Testing • Management Simulation Exercises

  9. Recommended Availability/Recovery Strategy (Continued) • Interruption/Disaster Recovery Program • Architecture - Contingency Planning Program (Disaster) - Restart Training • • Hardware/Systems Software Program • Data Center Maintenance & Escalation - Brunch Systems Maintenance & Escalation • • Application Architecture Program • - Application Release System - Restart Training (Interruptions) - Application Architecture Review

  10. Recommended Actions • Conduct Performance Testing • 2. Upgrade Development System (needed for Phase 2 interruptions) 3 .Create Architecture Review Team 4. Implement Application Architecture Review 5. Implement Disaster Plan 6. Contract with Disaster Backup Center 7. Implement Application Change/Release Procedure 8. Implement Help Desk WHEN Phase 2 Rollout Phase 2 Rollout Phase 2 Design Phase 2 Design Phase 1 Rollout Phase 1 Rollout NOW NOW