1 / 26

Visual Monitoring of Railroad Grade Crossing and railroad tracks

Visual Monitoring of Railroad Grade Crossing and railroad tracks. University of Central Florida. Visual Monitoring of Railroad Grade Crossing. Phase I. Objectives. Monitor railroad grade crossing for hazardous behavior. Issue a audio/visual alert. Self-contained portable system.

qiana
Télécharger la présentation

Visual Monitoring of Railroad Grade Crossing and railroad tracks

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Visual Monitoring of Railroad Grade Crossing and railroad tracks University of Central Florida

  2. Visual Monitoring of Railroad Grade Crossing Phase I

  3. Objectives • Monitor railroad grade crossing for hazardous behavior. • Issue a audio/visual alert. • Self-contained portable system

  4. System Overview • The main processing pipeline of the system:

  5. The Portable System Camera Solar Panels Main Processing Unit Carrying Unit Batteries Computer Vision LaboratoryUniversity of Central Florida

  6. Website Interface • Each site contains • Live image • Latest log file data • Trains detected • Train title • Date • Time • Objects detected • Object ID • Date/Time Computer Vision LaboratoryUniversity of Central Florida

  7. Email Alerts • Email alerts are triggered on activities • Alert frequency can be changed by user parameters • Each email contains • Site source location • Message about activity • Image of object involved in activity Computer Vision LaboratoryUniversity of Central Florida

  8. P421 P127 P135 Performance Evaluation • Detected Violators Mount Dora 03-01-2005, 11:32:33 03-01-2005, 11:32:19 03-08-2005, 13:18:23 New Smyrna Beach 03-11-2005, 15:17:53 03-02-2005, 12:42:57 02-22-2005, 11:01:42

  9. Visual Inspection of Railroad Tracks Phase II

  10. Basler A400 High speed firewire Mobile Platform Design

  11. Mobile Platform • The main factors driving the design of the mobile platform are: • Portability • Image Stability • Uniformity of Illumination conditions

  12. Mobile platform

  13. Video obtained from mobile platform Example rail video obtained from mobile platform

  14. Defect detection

  15. Engine Burn Defects • A condition in which the rail has been scarred by the heat created by locomotive. • Appearance in track. Round or oval rough spots or holes on the surface of the rail. 1 Burn area Burn area 1 Railroad Track Standards, Departments of the Army (TM 5-628)

  16. Processing Pipeline SVM

  17. Results = Detection = Confidence

  18. Results

  19. Results Potential burn regions

  20. Rail Crack Defects

  21. Rail Cracks • Stress caused by the wheels of the train can lead to cracks on the rail head. Rail Stress

  22. Processing Pipeline

  23. Current work

  24. Rail Gauge Verification • Objective: • Verify that the distance between rails is within a safe margin. Rail Gauge Synchronized high speed cameras

  25. Missing Fasteners • Detect missing fasteners Steel Clips or Fasteners Missing fasteners

  26. Thank you

More Related