1 / 5

MODIS Collection 5 Processing Status

MODIS Collection 5 Processing Status. May 14, 2008 Barbara DeShong Dr. Michael Teague. Collection 5 Forward Processing. Collection 5 (C5) forward processing started on data day January 1, 2007 On average the leading edge has been within 2 data days of real time

quade
Télécharger la présentation

MODIS Collection 5 Processing Status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MODIS Collection 5 Processing Status May 14, 2008 Barbara DeShong Dr. Michael Teague

  2. Collection 5 Forward Processing • Collection 5 (C5) forward processing started on data day January 1, 2007 • On average the leading edge has been within 2 data days of real time • The Gross Primary Productivity processing is 5 months behind the leading edge for Terra and 17 months for Aqua due to a change in the late look Montana data • Both Aqua and Terra are expected to be caught up to the leading edge by late-June, 2008

  3. Collection 5 Reprocessing • Terra reprocessing started on September 3, 2006 and Aqua started on May 4, 2007 • The C5 reprocessing was completed ahead of the original schedule on May 13 with the exception of Land Surface Temperature (PGE 16), and the final 8+ day PGEs for 2006 • LST requires an additional 32 days of processing through day 32/2007 and this should be completed by May 17, 2008 • The final 8+ day PGEs will be completed by May 19, 2008

  4. “Cleanup” Tasks (1 of 2) • Some cleanup tasks remain and MODAPS will use 3 production machines to complete these by July 3, 2008: • The L2G lites for Terra 2004 were inadvertently not exported to the LP DAAC. These are being re-reprocessed and will be completed by July 3, 2008 • MODHDFSR (PGE80) needs to be re-reprocessed for Terra for the interval 2000/274 – 2001/184. These were deleted erroneously. • This reprocessing will be completed by July 3, 2008 • MODHDFSR products are now archived in LAADS for access by the land science team

  5. “Cleanup” Tasks (2 of 2) • Cleanup tasks to be completed by July 3 (cont): • There are an additional 64 days of LST to reprocess due to splitting the production between machines. • This will be completed by June 12, 2008 • We have received a request to reprocess 3 16-day periods for the Terra 16-day Vegetation Composite (PGE72) from Mark Carroll • This will be completed by June 2, 2008 • There are likely to be additional periods • 153 days of CERES L1B subset data will be reprocessed due to premature deletion at the Langley DAAC • This will be completed by June 15, 2008

More Related