1 / 23

Fermilab Budget Presentation Research Program

Fermilab Budget Presentation Research Program. Hugh Montgomery February 27, 2006. Physics Research Program. Particle physics -- understand what are the fundamental components of our universe and how they interact. Experimental research uses Accelerators

quana
Télécharger la présentation

Fermilab Budget Presentation Research Program

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Fermilab Budget PresentationResearch Program Hugh Montgomery February 27, 2006

  2. Physics Research Program • Particle physics -- understand what are the fundamental components of our universe and how they interact. • Experimental research uses Accelerators • complex of accelerators at Fermilab, Tevatron Collider, Neutrinos • Large Hadron Collider, CERN, Switzerland. • Cosmic radiation; • optical telescopes • charged cosmic rays • WIMPS – cold dark matter • Two theoretical physics groups • particle physics • cosmology. • All the components of the research program are naturally intertwined.

  3. Publication History

  4. Strategy • Operate/support our Collider Physics (CDF, D0, CMS) • Operate our Neutrinos (MINOS, MiniBooNE) • Operate our Particle Astro (SDSS, CDMS, Auger) • Maintain leadership in Lattice Project, SciDAC ( Lattice, Accel. Modelling ) • Support NOvA R&D in the neutrino competition, preparation for CD1, CD2 reviews • Nurture two selected small enterprises: MINERvA, DES • One very small experiment SciBooNE • Increase participation in the LC R&D • Plan future high intensity proton program • Desired initiatives are consistent with Director’s Strategy and Business Plan from 2005

  5. The Physics Research Program DIRECT COSTS RunII Ops Upgrades NOvA MINERvA DES CMS

  6. Physics Research Program Budget FY2005-2008 DIRECT COSTS

  7. Physics Research Program FY2006 Budget DIRECT COSTS RunII Holding Flat Upgrades Done NOvA ramp DES Held CMS core rising

  8. Collider Physics • Run II operations continue to do well • Integrated Luminosity ~ 1.3 fb-1 for each experiment • ~ 1 fb-1 in summer conference results (one last week) • Computing is a challenge but is successful thus far • Run IIB: most upgrades in after shutdown • Note publications • Transition from Tevatron to LHC • CMS • CD4A a great success • Experiment to be completed (Silicon integration, Pixels for the US) • Transition to operating experiment • Computing Reviews continue to be very positive • Strong impact of physicist/CP team • Transitions from Tevatron experiments • Postdoc recruiting needs to ramp up • LPC appears to be successful so far • FNAL people continue to provide strong leadership • Run II   CMS Synergy

  9. Tevatron 1 fb-1 Result!

  10. Collider Physics – Issues/Actions • Run IIB upgrade projects end, some earned contingency to be recovered • Task Force Report • Attempting to respond • Limited by resources • Operations eat inflation, manpower in operations reduces • We try to apply individuals where need is evident • Attempt to gain with efficiencies, common solutions, common groups across the two experiments (eg system management of online, farms operations) • Attempting to maintain strong post-doc cadre • Run IIB Offline computing continues to rely on: • Lab computing infrastructure: buildings, power and cooling and has required very considerable investment • in kind computing from collaborations exploitation of which, in turn, relies on Laboratory Networking investments • Good news: ESNET plans now foresee an upgrade of supplied infrastructure

  11. MiniBooNE , Fixed Target Experiments & External Beams • MiniBooNE Operations going well • More than 7.2 x 1020 pot • Expect results in Summer • Systematic studies included multiple horn settings and reversed polarity (antineutrinos) • MIPP • Particle production experiment • Relevant to neutrino oscillations • Experiment completed its Priority 1 and 2 data • Future not evident • Test Beam • Healthy set of requests ( LHC, SuperB, generic, and ILC) • Operations work well • Attempting to develop plan for improved beam (low energy) • Pressure/requests for increased duty cycle

  12. Neutrinos • Long Baseline NuMI-MINOS • Construction projects completed • Operations have started well • Problems with horn and target • Anticipate the first results very soon (1 x 1020 pot) • MINERvA • NuMI near hall • Neutrino cross sections, physics and LBL projections • Directors CD1 review was very good, submission to DOE 3/2006 • CD0 in train? ( EIR complete) • Detector (~$9.2M), Installation(~$1.2M) • No construction in PB – Flat scenario • SciBooNE • Booster Beam, • Detector was used in K2K • Data will help T2K • KEK Director wrote to Pier • LArTPC a modest Liquid Argon neutrino initiative

  13. Neutrinos • NOvA • sin22q13, mass hierarchy • Next step in Long Baseline neutrino program • R&D in progress • Has CD0 (thankyou), awaiting NuSAG Report • Director’s CD1 Review tomorrow • DOE CD1 Review April 4-6 • Target is construction start in 2008 • No construction in PB – Flat scenario

  14. NOvA Project Funding Needs • 2007 • PED $11M • R&D Need $ 5M • 2008 • Construction • Site and Building, $ 44.7 M ($ 37.8 M obligation + 25% contingency) • Others Elements (Base Cost): • Scintillator startup $ 7.1 M • Extrusion startup, $ 3.0 M • APDs $ 8.3 M •  Block Raiser $ 2.2 M • Project Office $ 0.5 M • Director’s Review starts February 28

  15. Experimental Particle Astrophysics • SDSS • SDSS I complete • SDSSII established, started well, impressive SuperNova yield • Auger • Largest ground array • Beautiful hybrid capability • Operating well • Stretched for cash but first physics last summer • Definitive Agasa/HiRes resolution should come this year?? • CDMS • Best limits in the world • Starting full operation (5 towers) now cooled down • Looking to future (NSF funding, DOE proposal, FNAL in management, cryo,and electronics, all at controlled scale, 25 kg) • JDEM • Some important work for SNAP, mainly physicist effort & electronics • COUPP • Liquid Bubble chamber for cold dark matter

  16. Experimental Particle Astrophysics • DES • Very interesting Dark Energy initiative, exploits FNAL skills • Scale (~ $20M for instrument) -- possible for this decade • Generic ground based Dark Energy -- CD0 • Aiming for construction in FY08 • DOE MIE – FY08: $4.7,FY09:4.0, FY10:1.7M) • Cannot maintain pace in the PB - Flat scenario • Interest in collaboration from UC, U of I, U. Michigan, UK Consortium (UC London (PPARC), Portsmouth) Spanish Consortium (IEEC (Astrophysics), IFAE & CIEMAT (HEP)), all with contributions. • We need reading from DETF? • They need reading from FNAL/DOE to convince to commit.

  17. Physics Research Program BudgetFY2006-2008 Incremental Analysis DIRECT COSTS RunII Ops Flat No NOvA Const. No MINERvA Const. No DES CMS core rising

  18. Computing • Computing for Run II continues to do well • Production keeps pace with data taking • Improvements to handle higher occupancies • Improvements in calibration methodology • Analysis pace is also maintained • Flexibility of resources has been important • Record utilization of grid implementations for both experiments • Large non-FNAL, non-US, in-kind, contributions of computing • CMS C&S • Hardware installation tempered to match schedule • Deploy analysis computing just-in-time • Staffing has required internal transfers • Impact of team approach (physicists and computing professionals) is evident • Fermilab installed infrastructure (to Starlight) is part of operations, ESNET planning situation has improved • Infrastructure is a continuing issue down the line

  19. Central Computing & Networking • Lattice Project, Fermilab managing across BNL, FNAL and TJNAF, FNAL core support for the infrastructure • FermiGRID strategy is almost completely implemented, all farms participate, it has become a necessity • Open Science Grid is becoming increasingly important to a widening range of stakeholders. • Cyber Security Assist visits went extremely well, they identified several best practices which they are trying to propagate to other labs. It would be nice to see some return on this.

  20. Central Computing & Networking • But … • Operational and support staff (eg Networking) are under heavy pressure. Especially for Run II, this pinches the scientist leadership opportunities • It is difficult to improve when budgets are declining and when the outside world continues to attract, and be attracted by, our best people. • There is reliance also on remote, international computing for Run II, with cooperation on interoperability – our committees warn us that this is vulnerable to LHC competition • Support for traditional software, for example, simulations, ROOT, GEANT, needs to grow, especially for ILC. • We are attempting to rationalize DAQ/Controls effort for accelerator work, ILC controls initiatives, and some experiment support

  21. Budget Need DIRECT COSTS

  22. Budget Need DIRECT COSTS

  23. Summary • Fermilab continues to hum with activity • Collider Program remains strong, luminosity is growing • Neutrino Operations have been excellent • CMS participation is strong and strengthening • ILC is evident BUT • Concern about building a mid-term future experimental program • NOvA is supported for PED, needs more for R&D, needs strong FY08 construction start • MINERvA needs FY07 R&D and FY08 construction • DES needs FY07 R&D and FY08 construction • SciBooNE is at our limit • No other experimental initiatives are supported

More Related