1 / 5

SPSC 23/05/2000 - Agenda -

OPEN SESSION on Tuesday, 23 May 2000 at 09:00 h., Main Auditorium 1.Status report on NA58/COMPASS: F.Bradamante 2.Future NA49 Programme on Hadronic Physics with Proton and Pion Beams : H.G.Fischer (SPSC 2000-011 /P264 Add.5, SPSC 2000-023/M653)

Télécharger la présentation

SPSC 23/05/2000 - Agenda -

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. OPEN SESSION on Tuesday, 23 May 2000 at 09:00 h., Main Auditorium 1.Status report on NA58/COMPASS: F.Bradamante 2.Future NA49 Programme on Hadronic Physics with Proton and Pion Beams : H.G.Fischer (SPSC 2000-011 /P264 Add.5, SPSC 2000-023/M653) 3.A Study of the Link between Cosmic Rays and Clouds with a Cloud Chamber at the CERN PS : J.Kirkby (SPSC 2000-021/P317) CLOSED SESSION on Tuesday, 23 May at 11:30 h., 6th Floor Conference Room 1. Approval of the minutes of the 47th meeting. 2. Report on the 146th meeting of the Research Board 3. Status Report on the SPS 4. Status Report on the PS 5. Status Report on the PS and SPS experiments 6. Status of NA58: W.Kuehn 7. Status of NA49 : N.Pavlopoulos (SPSC 2000-011/P264 Add.5) 8. Discussion on NA49 Addendum : N.Pavlopoulos (SPSC 2000-011/P264 Add.5, SPSC 2000-023/M653) 9. Discussion on NA48 Addenda : Y.Declais (SPSC 2000-002/P253 Add.2, SPSC 2000-003/P253 Add.3) 10. Discussion on memorandum P316 : A. De Roeck (SPSC 2000-025/M654) 11. Discussion on a thesis on HARP: A.Magnon 12. Status Report on the ASACUSA RFQ: J.-P.Riunaud 13. Discussion on P317/CLOUD : F.Bobisut and P.J.Crutzen (SPSC 2000-021/P317) 14. SPS and PS schedules 15. A.O.B. Measurement of antiproton-proton elastic cross section below 100 MeV/c (SPSC 2000-022/I222/Revised). SPSC 23/05/2000 - Agenda -

  2. SPSC Open Session - Matters concerning the PS - OPEN SESSION on Tuesday, 23 May 2000 at 09:00 h., Main Auditorium 1. Status report on NA58/COMPASS: F. Bradamante 2. Future NA49 Programme on Hadronic Physics with Proton and Pion Beams : H.G. Fischer (SPSC 2000-011 /P264 Add.5, SPSC 2000-023/M653) 3. A Study of the Link between Cosmic Rays and Clouds with a Cloud Chamber at the CERN PS : J. Kirkby (SPSC 2000-021/P317)

  3. CLOSED SESSION on Tuesday, 23 May at 13:30 h., 6th Floor Conference Room 1. Approval of the minutes of the 47th meeting. 2. Report on the 146th meeting of the Research Board 3. Status Report on the SPS 4. Status Report on the PS 5. Status Report on the PS and SPS experiments 6. Status of NA58: W. Kuehn 7. Status of NA49 : N.Pavlopoulos (SPSC 2000-011/P264 Add.5) 8. Discussion on NA49 Addendum : N. Pavlopoulos (SPSC 2000-011/P264 Add.5, SPSC 2000-023/M653) 9. Discussion on NA48 Addenda : Y. Declais (SPSC 2000-002/P253 Add.2, SPSC 2000-003/P253 Add.3) 10. Discussion on memorandum P316 : A. De Roeck (SPSC 2000-025/M654) 11. Discussion on a thesis on HARP: A. Magnon 12. Status Report on the ASACUSA RFQ: J.-P. Riunaud 13. Discussion on P317/CLOUD : F. Bobisut and P.J. Crutzen (SPSC 2000-021/P317) 14. SPS and PS schedules 15. A.O.B. Measurement of antiproton-proton elastic cross section below 100 MeV/c (SPSC 2000-022/I222/Revised). SPSC Closed Session - Matters concerning the PS -

  4. CLOSED SESSION on Tuesday, 23 May at 13:30 h., 6th Floor Conference Room 1. Approval of the minutes of the 47th meeting. 2. Report on the 146th meeting of the Research Board 3. Status Report on the SPS 4. Status Report on the PS 5. Status Report on the PS and SPS experiments 6. Status of NA58: W. Kuehn 7. Status of NA49 : N.Pavlopoulos (SPSC 2000-011/P264 Add.5) 8. Discussion on NA49 Addendum : N. Pavlopoulos (SPSC 2000-011/P264 Add.5, SPSC 2000-023/M653) 9. Discussion on NA48 Addenda : Y. Declais (SPSC 2000-002/P253 Add.2, SPSC 2000-003/P253 Add.3) 10. Discussion on memorandum P316 : A. De Roeck (SPSC 2000-025/M654) 11. Discussion on a thesis on HARP: A. Magnon 12. Status Report on the ASACUSA RFQ: J.-P. Riunaud 13. Discussion on P317/CLOUD : F. Bobisut and P.J. Crutzen (SPSC 2000-021/P317) 14. SPS and PS schedules 15. A.O.B. Measurement of antiproton-proton elastic cross section below 100 MeV/c (SPSC 2000-022/I222/Revised). • COMPASS Expt • Start in 2001 ? • Good progress but still problems • with Straw Tracker • with Magnet for polarised target RAS SPSC Closed Session • Ions Expt • Requests for 80 GeV.A run in 2000 • Couldn’t the physics be done by Compass ? • Collaboration strength ? • Analyse the existing data first • CP violation Expt • Extension requested 120 d in 2002 & 2003 • Competition with P316 (ion runs) • Recommended for approval to RB • Ions Expt • Requests for Indium ions after 2001 • Reasonable aswers to questions • To be discussed at pre-Research Board RAS

  5. CLOSED SESSION on Tuesday, 23 May at 13:30 h., 6th Floor Conference Room 1. Approval of the minutes of the 47th meeting. 2. Report on the 146th meeting of the Research Board 3. Status Report on the SPS 4. Status Report on the PS 5. Status Report on the PS and SPS experiments 6. Status of NA58: W. Kuehn 7. Status of NA49 : N.Pavlopoulos (SPSC 2000-011/P264 Add.5) 8. Discussion on NA49 Addendum : N. Pavlopoulos (SPSC 2000-011/P264 Add.5, SPSC 2000-023/M653) 9. Discussion on NA48 Addenda : Y. Declais (SPSC 2000-002/P253 Add.2, SPSC 2000-003/P253 Add.3) 10. Discussion on memorandum P316 : A. De Roeck (SPSC 2000-025/M654) 11. Discussion on a thesis on HARP: A. Magnon 12. Status Report on the ASACUSA RFQ: J.-P. Riunaud 13. Discussion on P317/CLOUD : F. Bobisut and P.J. Crutzen (SPSC 2000-021/P317) 14. SPS and PS schedules 15. A.O.B. Measurement of antiproton-proton elastic cross section below 100 MeV/c (SPSC 2000-022/I222/Revised). • SPS has 86 % transmission (80 % in ‘99) • PS status report • PS statistics • AD status • Design values down to 2 GeV/c • Recent vacuum pb (quick fix) • Hope for beam 10th july (tight planning) • PS expts : DIRAC grateful to PS SPSC Closed Session - Matters concerning the PS - • HARP expt is still necessary) • Overall schedule has slipped • Test in Aarhus in summer • High level of Radio Freq. Interference • Installation planned week 37,40, 41 • Tight schedule • Committee took note • ASACUSA Phase 1 can be short • Discuss any changes with chairman • Expt in T11 (East Area) • Not yet recommended for approval RAS The committee took note