1 / 53

MEETING WITH HON’BLE CHIEF MINISTER, PUNJAB 09:00 AM 15 TH MAY, 2010

MEETING WITH HON’BLE CHIEF MINISTER, PUNJAB 09:00 AM 15 TH MAY, 2010. Subject : Strengthening of Health. Department. AGENDA. PRESENTATION BY HOSPITAL SERVICES CONSULTANCY CORP. REGARDING DESIGNS FOR VARIOUS HOSPITALS OVERALL REQUIREMENT OF FUNDS BUILDING WORKS NEW EQUIPMENT

radwan
Télécharger la présentation

MEETING WITH HON’BLE CHIEF MINISTER, PUNJAB 09:00 AM 15 TH MAY, 2010

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MEETING WITH HON’BLE CHIEF MINISTER, PUNJAB09:00 AM15TH MAY, 2010 Subject : Strengthening of Health Department

  2. AGENDA • PRESENTATION BY HOSPITAL SERVICES CONSULTANCY CORP. REGARDING DESIGNS FOR VARIOUS HOSPITALS • OVERALL REQUIREMENT OF FUNDS • BUILDING WORKS • NEW EQUIPMENT • FUNDING PATTERN • PURCHASE OF MEDICINES • REQUIREMENT OF STAFF • DOCTORS RECRUITMENT - DEPARTMENTAL SELECTION COMMITTEE HEADED BY PGI FACULTY • SURPLUS LAND • CONTROL ROOM IN PHSC • DOCTORS OPD & POSTING MONITORING SYSTEM • EQUIPMENT MONITORING SYSTEM • BIO-METRIC ATTENDANCE SYSTEM

  3. 2. OVERALL REQUIREMENT OF FUNDS

  4. 2. OVERALL REQUIREMENT OF FUNDS

  5. FUNDING PATTERN

  6. FUNDING PATTERN The following funding pattern was tentatively approved. Total Fund Requirement- 350.00 Crores

  7. FUNDING REQUIREMENT FOR BUILDING WORKS {Rs. in Crore}

  8. FUNDING REQUIREMENT FOR EQUIPMENT {Rs. in Crore}

  9. 3. BUILDING WORKS

  10. 3. BUILDING WORKS UPGRADATION OF EXISTING HOSPITALS A. DISTRICT HOSPITAL @Rs.17 lacs/bed

  11. B. SUB-DIVISIONAL HOSPITALS @Rs.17 lacs/bed

  12. @ Rs. 5 Cr./CHC C. UPGRADATION FOR EXISTING CHCs D. UPGRADATION OF 204 PRIMARY HEALTH CENTRES- UPGRADATION REQUIRED FOR 204 PHCs @ Rs. 17.0 lacs / PHC = 34.68 Crore UPGRADATION GRAND TOTAL(A+B+C+D)=71.78 CRORES

  13. CONSTRUCTION OF NEW HOSPITALS

  14. CONSTRUCTION OF NEW HOSPITALS @Rs.17 lacs/bed A. NEW DISTRICT HOSPITALS (PROPOSED) @Rs.17 lacs/bed B. NEW SUB-DIVISIONAL HOSPITALS (PROPOSED)

  15. C. NEW CHCs (PROPOSED) @Rs.5 Cr./CHC

  16. NEW CONSTRUCTION GRAND TOTAL(A+B+C)=196.00 CRORES

  17. LAND AVAILABILITY FOR NEW INSTITUTIONS

  18. LAND AVAILABILITY FOR NEW INSTITUTIONS

  19. MAJOR REPAIR OF EXISTING HOSPITALS

  20. A. MAJOR REPAIR OF DISTRICT HOSPITALS B. MAJOR REPAIR REQUIRED FOR 22 NUMBERS SUB-DIVISIONAL HOSPITALS = Rs. 4.83 Cr. (Dasuya, Garhshankar, Mukerian, Anandpur Sahib, Raikot, Samrala, Khanna, Jagraon, Mandi Gobindgarh, Kharar, Chamkour Sahib, Payal, Amloh, Bassi Pathana, Khamano, Dera Bassi, Pathankot). C. MAJOR REPAIR REQUIRED FOR 31 NUMBER CHCs = Rs. 4.97 Crores (Mand Mandher, Budha Bar, Hajipur, Tanda, Mahilpur, Sham Charuasi, Bhol Kalota, Nurpur Bedi, Banga, Mukandpur, Saroya, Gurusar Sudhar, Machhiwara, Sidhwan Bet, Sahnewal, Maloud, Pakhowal, Manupur, Dhudike, Bagha Purana, Kurali, Majitha, Narot Jaimal Singh, Jalalabad) GRAND TOTAL(A+B+C)=14.68 CRORES

  21. 4. NEW EQUIPMENT

  22. MAJOR EQUIPMENT FOR DISTRICT HOSPITALS RS. 21.97 CRORE

  23. MAJOR EQUIPMENT FOR SUB DIVISIONAL HOSPITALS RS. 14.11 CRORE

  24. MAJOR EQUIPMENT FOR COMMUNITY HEALTH CENTRES RS.20.46 CRORE CARDIAC MONITORS WITH DEFIBRILLATOR PULSE OXYMETER ECG MACHINES PHOTOTHERAPY UNITS RADIANT WARMERS OPERATION TABLES MOBILE O.T LIGHTS ELECTRIC CAUTERY X-RAY MACHINES LABORATORY EQUIPMENT FOETAL DOPPLER BOYLES APPARATUS AUTOCLAVE (V) HOSPITAL FURNITURE

  25. MAJOR EQUIPMENT FOR PRIMARY HEALTH CENTRES RS. 10.18 CRORE PHOTOTHERAPY UNITS RADIANT WARMERS MOBILE O.T LIGHTS FOETAL DOPPLER DELIVERY TABLES SUCTION MACHINES SURGICAL INSTRUMENT KITS BINOCULAR MICROSCOPES OTHER MINOR EQUIPMENT HOSPITAL FURNITURE GRAND TOTAL(DH+SDH+CHC+PHC)=RS.66.72 CRORES

  26. 5. PURCHASE OF MEDICINES

  27. 5.PURCHASE OF MEDICINES MAJOR CHUNK OF MEDICINES ARE BEING PURCHASED FROM CENTRAL PUBLIC SECTOR UNDERTAKINGS. TO BRING MORE REPUTED COMPANIES, MINIMUM TURNOVER CRITERIA HAS BEEN REVISED FROM RS.5 CR./ANNUM TO RS.15 CR./ANNUM. MORE STRINGENT TESTING CLAUSES HAVE BEEN PUT SAMPLES TO BE DRAWN BY PHSC SAMPLES TO BE TESTED FROM SHRI RAM LAB, NEW DELHI OR NABL ACCREDITED LABS ONLY.

  28. 6. REQUIREMENT OF STAFF

  29. 6.REQUIREMENT OF STAFF-DOCTORS

  30. 6. REQUIREMENT OF STAFF-PARAMEDICS * Recruitment Process for 379 posts of Staff Nurses has already been started.

  31. 6. REQUIREMENT OF STAFF- MINISTERIAL

  32. 7. DOCTORS RECRUITMENT- DEPARTMENTAL SELECTION COMMITTEE HEADED BY PGI FACULTY

  33. 7. DOCTORS RECRUITMENT - PGI ADVERTISEMENT FOR THE RECRUITMENT OF FOLLOWING POSTS OF DOCTORS HAS BEEN GIVEN IN VARIOUS NEWSPAPERS ON 02.05.2010 & 14.05.2010. MEDICAL OFFICERS-SPECIALISTS……………………….128 MEDICAL OFFICERS-GENERAL……………………………214 MEDICAL OFFICERS-DENTAL………………………………..34 The matter regarding the Departmental Selection Committee has been discussed with Dr. K.K. Talwar, Director, PGI and he is of the opinion that already existing Committee headed by Prof. (Retd.) Dr. J.S.Chopra may be retained.

  34. 8. SURPLUS LAND

  35. 8. SURPLUS LAND IN HEALTH DEPARTMENT

  36. 8. SURPLUS LAND IN HEALTH DEPTT. -AYUSH

  37. Gurdaspur

  38. Sangrur

  39. Ludhiana

  40. Nabha

  41. Balachaur

  42. Khiala Kalan

  43. Verka

  44. 9. CONTROL ROOM IN PHSC

  45. 9. CONTROL ROOM IN PHSC AT PHSC LEVEL, A CONTROL ROOM WILL BE SETUP TO RECEIVE SUGGESTION & COMPLAINTS 24X7 REGARDING HOSPITAL SERVICES. CONTROL ROOM WILL BE EQUIPPED WITH COMPUTERS  FAX  MOBILE  IVRS  INTERNET ETC. COMPLAINT CAN BE REGISTERED THROUGH WEBSITE, MOBILE, FAX OR TELEPHONE. HOSPITALS WILL MAINTAIN EQUIPMENT COMPLAINT REGISTERS. CONTROL ROOM WILL START FUNCTIONING FROM 15.6.2010

  46. 10. DOCTORS OPD & POSTING MONITORING SYSTEM

  47. 10. DOCTORS OPD & POSTING MONITORING SYSTEM POSTING OF DOCTORS DISPLAYED ON WEBSITE DAILY OPD STATUS BEING UPLOADED LEAVE/ ABSENT/ SPECIAL-DUTY/ TRAINING STATUS ALSO UPLOADED.

  48. 11. EQUIPMENT MONITORING SYSTEM

  49. 11. EQUIPMENT MONITORING SYSTEM LIST OF ALL MAJOR EQUIPMENTS UPLOADED ON WEBSITE. FUNCTIONAL STATUS ALSO BEING DEPICTED. DAILY USAGE OF EQUIPMENT ALSO ON WEBSITE.

More Related