1 / 16

Front end test stand — WP2 Lead author: David Findlay Accelerator Division ISIS Department

Front end test stand — WP2 Lead author: David Findlay Accelerator Division ISIS Department Rutherford Appleton Laboratory Michael Clarke-Gayther Alan Letchford John Thomason. Strong overlap. Why interest in front end? Front end of machine is where

raiden
Télécharger la présentation

Front end test stand — WP2 Lead author: David Findlay Accelerator Division ISIS Department

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Front end test stand — WP2 • Lead author: • David Findlay • Accelerator Division • ISIS Department • Rutherford Appleton Laboratory • Michael Clarke-Gayther • Alan Letchford • John Thomason

  2. Strong overlap • Why interest in front end? • Front end of machine is where • currents and duty cycles are set for whole machine • beam quality is set for whole machine • UKNF: 5 MW — Front end must be good! • Multi-megawatt proton accelerators are new • Neutrino factories • Neutron sources, transmutation,tritium, energy, etc. • 1 W/m loss max., ~10—7 loss per metre

  3. Neutrino factory proton driver: • Ion source (65 mA) • LEBT (low energy beam transport) • RFQ (75 keV 2.5 MeV, 280 MHz) • Chopper (typically ~30% chopped out) • DTL (2.5 MeV 180 MeV, 280 MHz) • Achromat • Synchrotrons • Need a front end test stand! Front end

  4. Ion source: H—, 65 mA, 400 µs • 2 × 2 × world’s leading H— source — ISIS • Existing negative ion source development programme at RAL for HPPAs in general • ASTeC • EU (network HPRI-CT-2001-50021) • This programme a benefit to front end test stand programme

  5. Ion Source Development Rig at RAL

  6. LEBT and RFQ • Low energy beam transport • Matches 65 mA from ion source to RFQ • RFQ • 4-rod, 75 keV 2.5 MeV, 280 MHz • These less of a problem • Can base on experience of LEBT and RFQ for ISIS • More a matter of implementation than R&D • But ~1–1½ MW RF driver required for RFQ

  7. Why chopper? Ion source Linac Ring Beam loss >10 × ISIS Bunching Also to minimise RF transients and control beam intensity

  8. With chopper — gaps in beam Ion source Linac Ring No beam loss Bunching

  9. Chopper performance required DC accelerator RF accelerator ns – µs spacing UKNF: 280 MHz, bunch spacing 3.57 ns Switch between bunches Good On Off Bad Partially chopped bunches a problem! Tune shifts!

  10. Choppers across the world: • SNS 402 MHz, slow — only chopper built • CERN 352 MHz, power dissipation? • RAL 280 MHz, fast, rugged, “UK” LEBT MEBT SNS, 2½ ns per bunch

  11. RAL aspiration: switch in 2 ns and dissipate ~3–4 kW (when “off”) 2-stage process Slow transmission line 1 0 1 0 Lumped line — thermally hardened 2 ns 8 ns

  12. RAL beam chopper— outline scheme Beam ~1 m Need to build andtest with bunched beam

  13. Build test stand • Ion source (R&D already • under way) • LEBT • RFQ (bunches beam) • Chopper • Diagnostics Experience of building test stands at RAL — ISIS RFQ test stand

  14. Front end test stand at RAL — costs SY £k (hardware incl. VAT + contingency) Overall design + infrastructure 8 398 Ion source 7 347 LEBT 5 231 RFQ 14 1388 Chopper 481990 4355 hardware 185 travel 82 4495 staff 9035 total

  15. Front end test stand at RAL — time scales

  16. Front end test stand at RAL • Six-year programme to build • Costed on basis of test stand already built and working • ~£4½M equipment • ~80 staff-years • RAL + university staff • Physics and engineering of real accelerator facility