20 likes | 151 Vues
The SC19 report to SC18, dated June 2014, outlines the current status of 23 standards related to perforating, packers, bridge plugs, subsurface flow control, sand screens, gas lift, barrier valves, completion accessories, and liner hangers. Key developments include first ballots for packers and bridge plugs, subsurface safety valves, and initial ballots for sand screens and completion accessories expected in Q3 and Q4 of 2014. Additionally, several ongoing revisions and drafts are aimed towards enhancing industry practices, with anticipated publications in 2015 and beyond.
E N D
SC19 report to SC18 June 2014 SC 19 covers Perforating, Packers & Bridge Plugs, Subsurface Flow Control, Sand Screen, Gas Lift, Barrier Valves, Completion accessories, Liner Hangers. We have 23 standards in revision or newly created and one SR3 to submit • 11D1 – Packers and Bridge Plugs – first ballot in Q3, 2014 – to publish in Q4 • 14A – Subsurface Safety Valve – second ballot closes July 10th – to publish in Q4 • 14B – SSSV installation – draft almost complete, will follow 14A for alignment • 19S – Sand Screens – adopt-back of ISO 17824 – initial ballot in Q3 2015 • 19L – Liner Hangers – in process – potential publication in 2015 • 19A – Completion Accessories – adopt-back of ISO 14998 – initial ballot in Q2 2015 • 19B – Peforators – Revising by section - • 19B1 – Evaluation in Concrete Targets – Ready for ballot • 19B2 – Evaluation under stress – Released • 19B3 – Evaluation at temperature – In Process • 19B4 – Evaluation of Flow Performance – Revision complete • 19B5 – Debris Evaluation – Draft complete • 19B6 Gun Swell – Ready to publish • RP67 – Explosive Safety – revising entire document (just beginning, divided in 11 Task Groups)
SC19 report to SC18 June 2014 SC 19 covers Perforating, Packers & Bridge Plugs, Subsurface Flow Control, Sand Screen, Gas Lift, Barrier Valves, Completion accessories, Liner Hangers. • 19TT1 –Downhole Well Test Tools – 95% complete – ballot in Q3 2014 • Gas Lift Handbook – just beginning – replaces several RPs – hope to publish in 2016 • 19G1 – Side-pocket mandrels – SR3 was approved, TG assessing scope • 19G2 – Flow control devices – in Work Group test ballot prior to ballot • 19G5 – Operations & Maintenance of GL - SR3 was approved, work progressing • 19G6 – Design of installations using IPO valves – 97% complete – initial ballot Q3 2014 • 19G10 - Design and Operation of Intermittent Gas-lift – Review 90% complete, ballot by Q4 2014 • 19G11 – Dynamic Simulation of Gas-Lift Wells and Systems –failed ballot, resolving comments • 19G12 – Gas-lift Automation – 30% Complete • SC approved SR3 for Open Hole Packers to be presented to CSOEM for approval.