1 / 1

SC19 report to SC18

SC19 report to SC18. SC 19 covers Perforating, Packers & Bridge Plugs, Subsurface Flow Control, Sand Screen, Gas Lift, Barrier Valves, Completion accessories, Liner Hangers. We have 15 standards in revision or newly created .

min
Télécharger la présentation

SC19 report to SC18

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SC19 report to SC18 SC 19 covers Perforating, Packers & Bridge Plugs, Subsurface Flow Control, Sand Screen, Gas Lift, Barrier Valves, Completion accessories, Liner Hangers. We have 15 standards in revision or newly created. • 11D1 – Packers and Bridge Plugs – first ballot in Q1, 2014 – hope to publish in Q2/Q3 • 14A – Subsurface Safety Valve – first ballot closes 12 Feb. – hope to publish in Q2/Q3 • 14B – SSSV installation – ballot in Q1, 2014 – hope to publish in Q2/Q3 • 19S – Sand Screens – adopt-back of ISO 17824 – initial ballot in Q1, 2015 • 19L – Liner Hangers – in process – potential publication in 2015 • 19A – Completion Accessories – adopt-back of ISO 14998 - SR3 to revise just submitted • 19B – Peforators – Revising by section • RP67 – Explosive Safety – revising entire document (just beginning) • 19TT1 –Downhole Well Test Tools – approximately 85% complete – ballot in Q2, 2014 • Gas Lift Handbook – just beginning – replaces several RPs – hope to publish in 2016 • 19G1 – Side-pocket mandrels – SR3 to revise just submitted • 19G2 – Flow control devices – first ballot in Q3, 2014 • 19G3 – Running, pulling, & K/O tools – Color coding complete. Minor changes needed. • 19G5 – Operations & Maintenance of GL - SR3 to revise just submitted • 19G6 – Design of installations using IPO valves – 90% complete – initial ballot in Q1, 2014 • API Monogram program, Q1 well understood and utilized with the SC documents.

More Related