Viikki experimental streets

Viikki experimental streets. Built by the City of Helsinki public works department and Helsinki University with TEKES funding in 2002-2003, co-operation with Tampere polytechnic, Infratec Oy, Lemminkäinen Oy, Kekkilä Oyj, Fountain Oy, Tihveräinen Oy Project leader Eero Nikinmaa

ramla
Télécharger la présentation

Viikki experimental streets

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Viikki experimental streets • Built by the City of Helsinki public works department and Helsinki University with TEKES funding in 2002-2003, co-operation with Tampere polytechnic, Infratec Oy, Lemminkäinen Oy, Kekkilä Oyj, Fountain Oy, Tihveräinen Oy • Project leader Eero Nikinmaa • Planning and building stage: Jenni Sirviö • Helsinki City: Pentti Peurasuo • 2 streets in Viikki area: • Norkkokuja in residential area • Pasteurinkatu in campus/office area • 3 sectors with different soil in each street

  2. Setup • Skeletal soils • Skeleton of smaller (d 32-64mm) or larger (d 64-140mm) rocks • 75 to 80 % of rocks and 20 to 25 % of soil (weight) • in volumetric terms: rocks ~45 %, soil ~45 %, + ~10 % empty space • different soils • soil 1: added N + minerals that slowly release P and K, low on organic matter (less than 6 %) • soil 2: high organic matter content (about 20 %), plenty of easily available nutrients • soil 3: coarse sand, little organic matter (less than 6 %) • laboratory tested for load bearing properties: all equally good • One meter deep, continuous layer of growth medium

  3. Skeletal soil n:o 2

  4. Setup • pavement: 3 different types • alder (Alnus glutinosa var. pyramidalis) in Norkkokuja and linden (Tilia x vulgaris, T. sp) in Pasteurinkatu • ~5 trees per treatment in Norkkokuja, 3 in Pasteurinkatu • 3 intensive monitoring points per street • 8 manual points in Pasteurinkatu, 11 in Norkkokuja

  5. Monitoring • Intensive monitoring in every 5-10 minutes • Soil: automatic • Temperature profile • Soil moisture profile • Soil: manual • Gas concentrations (manually, ~once per month) • root development: samples every 1-2 years • soil nutrients, SOM, Pf-curves yrs 2003, 2005, 2008 • Above ground: automatic • PAR • Air temp • Other micrometeorological information from Kumpula weather station

  6. Monitoring • Tree: automatic • sap flow: needles and collar methods • trunk growth: collar • Tree: manual • shoot growth: manually, 2-3 times/week • structure, leaf area: once per growing season • gas exchange, net photosynthesis and chlorophyll fluorescence in June and August • leaf nutrient status every 1-2 years • growth analysis pictures in the beginning and end of growing season