1 / 6

-energy calibration and resolution (end 2006) -Implementaion in LDC/Mokka (end 2006)

Milestones LumiCal simulation. -energy calibration and resolution (end 2006) -Implementaion in LDC/Mokka (end 2006) -realistic simulation (2007) -background studies, occupancy (2007) -Clustering (blind reconstruction) (2007)

rarnett
Télécharger la présentation

-energy calibration and resolution (end 2006) -Implementaion in LDC/Mokka (end 2006)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Milestones LumiCal simulation -energy calibration and resolution (end 2006) -Implementaion in LDC/Mokka (end 2006) -realistic simulation (2007) -background studies, occupancy (2007) -Clustering (blind reconstruction) (2007) -tracking plane in front (2007/08) -digital calorimeter (2007) -crossing angle, magnetic field (2008) MPI Munich

  2. Milestones BeamCal simulation -full simulation of BD algorithms, minimal set of layers (end 2006) -background backscattered in the central detector (2007) -concept fast readout scheme (2007) -test of algoriths for fast feedback (2007) MPI Munich

  3. RO Electronics and sensors -test of amplifier from NCPHEP (2006) -Design and manufacturing for test beam use (2007/08) -test board for phy3, performance studies (2006) -technical design for RO (2007) -Radiation hardness studies (2006/07 ….) -readout-structure on sensor plane signal shape, cross talk, (2007) -Si, GaAs prototype sensors (2006/07) -TAU laboratory (2006/07) -israeli industry for si-sensor design, production (2006/07) MPI Munich

  4. Personnel situation BNL: 0.7 FTE + Postdoc (req) Colorado: Cracow INP: Cracow Univ.: DESY: 2 FTE, 2 Postdocs, 2 Ph.D., 1 Dip.st. part time: electronics engineer JINR:2 part time FTE, 1 Ph.D. NCPHEP: 1 FTE, 1 Ph.D. Prague: 1 Ph.D. TAU: 1 Diploma, 1.5 FTE VINCA: 0.5 Ph.D. 0.5 FTE, Postdoc (req) Yale: MPI Munich

  5. Budget (no personnel) BNL: Colorado: Cracow INP: Cracow Univ.: DESY: 50 – 80 k /year JINR: NCPHEP: Prague: TAU: VINCA: Yale: MPI Munich

  6. Working groups -Beam Diagnostics (Ch. Grah, Bill) -Simulation BeamCal/LumiCal (Bogdan) -Sensors beam, tests (Wolfgang La.) - Readout electronics (Cracow) - Laser alignment, mechanics (Wojtek) MPI Munich

More Related