An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. GIS in Water Resource Term ProjectRiver Mapping Using Low Cost Small Unmanned Aerial Vehicle with Remote Sensing Platform Yiding Han Dept. of Electrical and Computer Engineering Utah State University E: yiding.h@aggiemail.usu.edu 12/02/2008

  2. Introduction • Background • Project Objects • Data Acquisition • Results • Conclusions GIS in Water Resource - Term Project Presentation

  3. What is UAV? • unpiloted aircraft • remote controlled • fly autonomously • pre-programmed flight plans • complex dynamic auto-navigation • military role • growing number of civil applications GIS in Water Resource - Term Project Presentation

  4. Why UAV? Safe Easy Low cost GIS in Water Resource - Term Project Presentation

  5. Our UAVs • Different sizes (air frames) • from 25 inches to 72 inches • Different payloads • GhostEye cameras: RGB/NIR cameras • Video cameras • Thermal Infrared Camera • Different missions • River Mapping • … GIS in Water Resource - Term Project Presentation

  6. River Mapping Mission • River path might change seasonally • Current remote sensing systems • Hard to use • Not accessible to anyone • High cost • A better tool is needed GIS in Water Resource - Term Project Presentation

  7. UAVs River Mapping Schedule • Design flight plan • Drive to launch site • Launch the plane • Wait • Land the plane • Take the images back for further processing GIS in Water Resource - Term Project Presentation

  8. Design the flight plan GIS in Water Resource - Term Project Presentation

  9. Contd... • Problems • Data may have error • Tedious • Elevation change is hard to input • Time consuming • …… • Use GIS to help us generate the waypoints GIS in Water Resource - Term Project Presentation

  10. Data source • DEM Data • USGS • http://seamless.usgs.gov • Riverflow of Bear River • NHDPlus • http://www.horizon-systems.com/NHDPlus/ GIS in Water Resource - Term Project Presentation

  11. Flight path given by ArcGIS GIS in Water Resource - Term Project Presentation

  12. Generate the waypoints • Waypoints are saved in an xml file GIS in Water Resource - Term Project Presentation

  13. Outcome in GCS GIS in Water Resource - Term Project Presentation

  14. Mosaic of pictures GIS in Water Resource - Term Project Presentation

  15. Good Mosaic GIS in Water Resource - Term Project Presentation

  16. Bad Mosaic GIS in Water Resource - Term Project Presentation

  17. Conclusions • With the help of GIS, it is a lot easier and faster to make complicated flight plan. • The generated waypoints are more accurate. • With 3D coordinate waypoints, UAVs can fly above more complicated terrain. GIS in Water Resource - Term Project Presentation

  18. Thanks GIS in Water Resource - Term Project Presentation