X-IPITER Concept

X-IPITER Concept. 2005 AUVSI Undergraduate Student UAV Competition Mississippi State University October 8, 2004. Team Members. Advisors Dr. Randolph Follett (ECE) Calvin Walker (ASE) Division Managers Blake Sanders (ASE): Project Ian Broussard (ASE): Airframe

rayya
Télécharger la présentation

X-IPITER Concept

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. X-IPITERConcept 2005 AUVSI Undergraduate Student UAV Competition Mississippi State University October 8, 2004

  2. Team Members • Advisors • Dr. Randolph Follett (ECE) • Calvin Walker (ASE) • Division Managers • Blake Sanders (ASE): Project • Ian Broussard (ASE): Airframe • Craig Ross (ECE/CSE): Systems

  3. Airframe Members • Mark Dyess (ME) • Marty Brennan (ASE) • Sam Curtis (ASE) • Jutima Simsiriwong (ASE) • Luke Hollingsworth (HS) • Anthony Vizzini II (ASE/HS) • Chris Martin (ASE) • Jared Allen (ASE)

  4. Systems Members • Joel Konkle-Parker (ASE) • Brian Thomas (CSE) • Nathan Whitfield (ASE) • Chris Robinson (CSE) • Chris Harper (ECE) • Ricky Gray (ECE)

  5. Objective “Design and build an unmanned aerial vehicle (UAV) capable of performing realistic autonomous missions in an aviation environment”

  6. Competition Requirements • Journal paper of no more than 20 pages (20%) • Static Judging (20%) • Safety • Failsafe demonstration • Craftsmanship • Oral presentation • Mission performance (60%)

  7. Mission Requirements • Autonomous or manual takeoff • Autonomously navigate through specified waypoints (if manual takeoff, demonstrate transition to autonomous flight) • Dynamic re-tasking of aircraft during flight • Provide imagery, total number of targets, GPS coordinates, and target orientation • Autonomous or manual landing within a specified area

  8. Mission Restrictions • Ceiling: 500ft AGL • Floor: 50ft AGL • No-fly zones: TBA • Max Weight: 55lbs • Max Mission Time: 40min

  9. Overall Concept • Takeoff will be autonomous • Cruise altitude will be approx. 200ft AGL • Airframe and systems total weight will be approx. 30lbs • Autonomous flight will be controlled via Micropilot 2028g • Digital still and video cameras will be used for image capture of targets • Image processing will be performed using Labview Image Acquisition (IMAQ) • A drag chute will be incorporated to minimize landing distance

  10. Airframe Concept • Wing • Airfoil Section: SD7062 • Chord: 16in • Span: 106in • Area: 1696in2 • Aspect Ratio: 6.5 • Fuselage • Length: 40in • Length (Tip to Tail): 80in • Width: 8.5in • Height: 8.5in

  11. Airframe Concept, Cont. • Empennage • Horizontal • Span: 34in • Chord (Root): 11.3in • Chord (Tip): 5.6in • Vertical • Height: 16in • Chord (Root): 15in • Chord (Tip): 7.5in

  12. Airframe Concept, Cont. • Engine • Saito 180 4-Stroke • Fuel Tank • 24 oz • Propeller • 17in dia. • Radio Control • Futaba 9-Channel

  13. System Concept

  14. Ground Station Concept

  15. Software Concept

  16. Electrical System Concept

  17. Milestones • Conceptual Design Review: 8 Oct 04 • Software Complete: 3 Nov 04 • Electrical System Complete: 3 Nov 04 • Preliminary Design Review: ? Nov 04 • Critical Design Review: ? Jan 05 • Airframe Complete: 24 Jan 05 • First Flight (Airframe Only): 28 Jan 05 • Airframe/Systems Integrated: 10 Feb 05 • First Flight (Integrated): 11 Mar 05 • 1st Place in Competition: 3 Jul 05

  18. Airframe Schedule • Fabrication: 11 Oct 04 – 10 Jan 05 • Wing: 11 Oct – 25 Oct 04 • Empennage: 11 Oct – 25 Oct 04 • Fuselage: 25 Oct – 10 Jan 05 • Final Assembly: 10 Jan – 24 Jan 05 • Rollout Ceremony: 25 Jan 05

  19. Systems Schedule • Software programming: 3 Oct – 3 Nov 04 • Boosting wireless range: 4 Oct – 3 Nov 04 • Micropilot testing: 9 Oct – 16 Oct 04 • Power supply design: 15 Oct – 3 Nov 04 • System testing: 4 Nov – 4 Dec 04 • Component integration: 10 Jan – 10 Feb 05

  20. Budget • Landing Gear.........……………. $110.00* • Prop (4)............………………....$82.20 • Fiberglass ......………………......$300.00 • Carbon Tubes (3)...……….…….$282.00 • Foam................………………….$100.00* • Servos..............………………….$150.00* • Engine Mount..………………….$8.00 • Prop-nut (3)……………………..$27.00 • Push Rods………………….……$15.00* • Wood..........……………………...$40.00* • Wheels.........……………….……$25.00* • Fuel Tubing....…………………..$2.00* • Glow Plug.....……………………$10.00* * Estimated Cost

  21. Budget, Cont. • Video Camera…………….………...$99.99 • Routers (2)…………………….……$159.98 • Prometheus Cable Kit………………$80.00 • Prometheus 32MB Flash Disk…..….$80.00 • Antenna………………………….….$150.00* • Batteries...…….………………….…$50.00* • Brushless DC Motor……………..…$200.00* • Paint……………………………...…$100.00* • Miscellaneous…….……………..….$100.00* Total…………….………$2171.17* * Estimated Cost

  22. Current Status • Airframe • Initial CAD complete • Fabrication materials on order • Systems • Design 80% complete • Software in development • Hardware on order