1 / 18

-Wy: Dynamic derivation

006-i. CHAPTER. -Wy: Dynamic derivation. 1:7. W+200mm. Radius 150mm. Aluminium tape. Wye. 3.000mm. Cover bottom. Cover top. 1. D raw the template of the cover bottom and cut toward “EXTERNAL”. Cover top. Wye. 3.000mm. Cover bottom. 2.

read
Télécharger la présentation

-Wy: Dynamic derivation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 006-i CHAPTER -Wy: Dynamic derivation

  2. 1:7 W+200mm Radius 150mm Aluminium tape Wye 3.000mm Cover bottom Cover top 1 • Draw the template of the cover bottom and cut toward “EXTERNAL”.

  3. Cover top Wye 3.000mm Cover bottom 2 • Copy the template and to cut on the contrary: toward the “INTERIOR”.

  4. Wye =3.000mm 3 • Cut the walls and make the female before of to glue.

  5. Wye Bent Aluminium tape 4 • Detail of the internal deflector.

  6. Wye Glue 5 • Glue all the sides cut at 45º

  7. Aluminium tape Wye Exterior face 6 • Unite the four sides with aluminum tape for the exterior.

  8. Wye Interior face 7 • Rotate the duct in position with the interior face up.

  9. Wye 2 1 8 • Close the piece follow the order.

  10. Wye Internal deflector 3 9 • Place the wall of the deflector.

  11. Position internal deflector Internal deflector Wye 4 10 • Adapt the internal deflector in the correct position.

  12. Wye 5 11 • Place the external wall of the elbow part.

  13. Wye Glue Triangle clips panel Aluminium tape 12 • Finish off of the internal deflector.

  14. Wye 6 13 • Place the internal wall of the elbow part.

  15. Pressing Aluminium tape Silicon inside Wye 14 • To press, to tape, to clip and to make the male.

  16. Wye 3.000mm • Samples of application: wye of “SHORT ENTRANCE” (1)

  17. Wye 3.000mm • Samples of application: wye of “LONG ENTRANCE” (1)

  18. Wye 3.000mm • Samples of application: wye of “LONG ENTRANCE” (2)

More Related