html5-img
1 / 11

IEEE802.15.3 MAC Committee report and plan

This document provides a report on the activities of the IEEE802.15.3 MAC committee during the Orlando Interim meeting, as well as the planned activities leading up to the Portland Plenary meeting.

reedjohn
Télécharger la présentation

IEEE802.15.3 MAC Committee report and plan

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: IEEE802.15.3: MAC Committee Closing Report and Plan Date Submitted: May, 2001 Source: Allen Heberling Company: XtremeSpectrum Address: 8133 Leesburg Pike, Suite 700, Vienna, Virginia 22182 Voice: +1.703.269-3022, FAX: +1.703.749.0249, E-Mail: aheberling@xtremespectrum.com Re: [ ] Abstract: Orlando TG3 MAC report and plan Purpose: 1) To report to the IEEE 802.15.3 regarding the activities of the IEEE 802.15.3 MAC committee accomplished during the Orlando Interim meeting. 2) To inform the IEEE 802.15.3 regarding the activities the TG3 MAC committee is planning for the time interval leading up to the Portland Plenary Meeting. Notice: This document has been prepared to assist the IEEE P802.15. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that these viewgraphs become(s) the property of IEEE and may be made publicly available by P802.15. Allen D. Heberling, XtremeSpectrum

  2. TG3 MAC Committee Closing Report and Plan at Orlando, May 2001 Allen D. Heberling, XtremeSpectrum

  3. Overview • Report the TG3 MAC committee activities during the Orlando Interim meeting. • TG3 MAC Activities planned for the time interval leading up to the Portland Plenary. Allen D. Heberling, XtremeSpectrum

  4. TG3 MAC Committee Activities Accomplished during the Orlando Interim • Collected, categorized and prioritized comments in the Open Issues List (doc:01/114r3…) • Reviewed 214 MAC Open Issues. • Approved 70 amendments to create D0.5 • Incorporated resolved issues into MAC amendments document 01/221r0… • Tom Siep presentation regarding draft standard editorial processes Allen D. Heberling, XtremeSpectrum

  5. TG3 MAC Committee Activities Accomplished during the Orlando Interim continued… • Submitted for approval the MAC amendments doc: 01/221r0… describing recommended modifications to D04 to create D05 Bill Arbaugh presentation regarding Security/Privacy in WPAN devices • Completed a MAC committee Plan (doc: 01/237…) for the interval between the Orlando Interim meeting and the Portland Plenary meeting. Allen D. Heberling, XtremeSpectrum

  6. TG3 MAC Committee Activities Planned for the Interval Leading Up To the Portland Plenary: • 5 Conference Calls Scheduled • Dates: 5/29, 6/5, 6/12, 6/19, 6/26 • Purpose: • Identify a date and location (tentative DC area) for a MAC ad-hoc meeting 30 days from end of Orlando meeting. • Monitor/report progress • Continue resolving open issues • Generation of Amendments for inclusion into D0.6, one week prior to Portland Plenary Allen D. Heberling, XtremeSpectrum

  7. TG3 MAC Committee Activities Planned for the Interval Leading Up To the Portland Plenary cont…: Prepare or Complete these clauses: • 6.3.x.y MLME-Channel-Time.req/ind/rsp/confirm • 6.3.x.y MLME-CoordHndOvr.req/ind/confirm • 6.3.x.y MLME-StreamConnect.req/ind/confirm • 6.3.x.y MLME-StreamDisconnect.req/ind/confirm Allen D. Heberling, XtremeSpectrum

  8. TG3 MAC Committee Activities Planned for the Interval Leading Up To the Portland Plenary cont…: • 6.3.x.y MLME-Repeater.req/ind/confirm • 6.3.x.y MLME-ChannelStatus.req/ind/confirm • R. Roberts to author w/ inputs from staff. Allen D. Heberling, XtremeSpectrum

  9. TG3 MAC Committee Activities Planned for the Interval Leading Up To the Portland Plenary cont…: • 7.3.7 Power Management Parms Clause • J. Bain to author w/ inputs to MLME sub-clause • 8.10 Power Management Clause • J. Bain to author • 8.12 Frame Xchng Clause • W. Shvodian to author Allen D. Heberling, XtremeSpectrum

  10. TG3 MAC Committee Activities Planned for the Interval Leading Up To the Portland Plenary cont… • 7.3.6 Security Parms Clause • Greg Rasor to author w/ input from B. Arbaugh and the Security committee. • 9.0 Security/Privacy Clause • Greg Rasor to author w/ input from B. Arbaugh and the Security committee. • Complete MSCs and a high level 15.3 SDL Model for the Portland Plenary. • A. Heberling to author Allen D. Heberling, XtremeSpectrum

  11. Still Unassigned: • 8.5 Frag and De-Frag (SAR) Clause • 8.11 Tx Power Control Clause • 7.3.8 Tx Power Control Parms Clause Allen D. Heberling, XtremeSpectrum

More Related