1 / 1

DSNA needs & Policy

DSNA needs & Policy. Final approach Conventional Navaids rationalisation while maintaining the same level of performance -> APV&LNAV Terminal Area SID/ STARs with turning legs for environmental improvements & shorter tracks

reid
Télécharger la présentation

DSNA needs & Policy

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. DSNA needs & Policy • Final approach • ConventionalNavaids rationalisation whilemaintaining the samelevel of performance • -> APV&LNAV • Terminal Area • SID/STARswithturning legs for environmentalimprovements & shortertracks • SESAR concept & PrecisionTactical Clearance = RNP for TMA operations • -> RF capability & Advanced RNP (1NM TSE) & RNAV holding • -> VNAV ? • En-Route • Free-route development. ATC keeps an eye on trafic through « conflictdetectiontools » (CDT) The betteraircraft performances we have, the better CDT resultsweget • Turning legs for the remainingfixed route network • -> What PBN for the various steps of FreeRouting and for its long terms targets? • -> RF or FRT for En-Route ? • General • Multiconstellationwillbeneeded for a robust RNP • ATC need a very large percentage of the fleet to beequipped to provide PBN benefits in the busiest TMA/Approaches • -> As few mandate exemptions as possible

More Related