reid
Uploaded by
15 SLIDES
295 VUES
150LIKES

Achieving Weight Loss and Improved Fitness: A Personal Improvement Project

DESCRIPTION

This personal improvement project focuses on overcoming the challenges of a sedentary lifestyle and unhealthy eating habits, resulting in elevated stress levels and low self-esteem. To address this, a structured plan was designed to incorporate regular gym visits, aiming for at least 3 sessions per week and a weight loss goal of 10 pounds over 4 weeks. The project emphasizes preparation, varying exercise routines, and maintaining a balanced diet. Results show increased exercise minutes daily and a 5.4-pound weight loss, showcasing the importance of commitment and measurement in achieving fitness goals.

1 / 15

Download Presentation
Télécharger la présentation

Achieving Weight Loss and Improved Fitness: A Personal Improvement Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Losing Weight Through Exercise Personal Improvement Project HSCI 708 AT

  2. Problem Statement • Pre-Project exercise was none at all which leads to high stress levels and low self esteem. • Overweight by 15 pounds according to the Body Composition Analysis. • Skipping exercise and eating a high fat diet leads to consistent weight gain and an increase for Type 2 Diabetes.

  3. Project Plan • Process Owner: Fiancé • Time Line: 4 weeks (O9/09/03 – 10/07/03) • Goals: • To increase and sustain daily exercise by going to the gym at least 3 times a week. • To lose 10 pounds. • To develop a permanent change to my weight by exercising.

  4. Being Prepared: No excuses for not exercising. Always pack gym bag the night before and place in the car. Leaving work on time. Sleeping better so that more energy is available to exercise. Combining a variety of group exercises including boot camp, spinning, yoga and pilates. Improved athletic performance. What Contributes To Exercise?

  5. Identify Areas of Intervention • Vary exercise activity. • Pack gym bag the night before so that exercise can be done immediately after work. • Leaving work on time and and arrive on time. • Not eating out dinner so often.

  6. Daily Basis

  7. How Will I Measure • Measuring the days between exercising • Measure the times exercising per week.

  8. New Workday Routines

  9. New Workday Routines

  10. Data Collection

  11. Data Collection

  12. Results • In the first Time Between Charts, there was not a failure however the process must be continued to see more results. • Average minutes exercised increased from 0 minutes per day to 58 minutes a day. • Weight decreased by 5.4 pounds during a one month time period.