RISK-BASED MANAGEMENT OF GUARDRAILS: SITE SELECTION AND UPGRADING

RISK-BASED MANAGEMENT OF GUARDRAILS: SITE SELECTION AND UPGRADING. Presented to Project Steering Committee by The Center for Risk Management of Engineering Systems February 23, 2000. Agenda. Introduction Data driven approach to risk assessment Data representation for site screening

renee-wood
Télécharger la présentation

RISK-BASED MANAGEMENT OF GUARDRAILS: SITE SELECTION AND UPGRADING

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RISK-BASED MANAGEMENT OF GUARDRAILS: SITE SELECTION AND UPGRADING Presented to Project Steering Committee by The Center for Risk Management of Engineering Systems February 23, 2000

  2. Agenda • Introduction • Data driven approach to risk assessment • Data representation for site screening • Multiple objectives in the selection among candidate projects • Discussion

  3. Project Team Center for Risk Management of Engineering Systems James H. Lambert, Research Assistant Professor of Systems Engineering Yacov Y. Haimes, Quarles Professor of Systems Engineering and Civil Engineering and Center Director Jeffrey A. Baker, BS/MS Student Capstone Team Christian Baldwin Irene Jacoub Mike Raker VDOT Richmond District Travis Bridewell, District Traffic Engineer, Richmond District Jeff Wilkinson, Transportation Engineer, Traffic Engineering Section, Richmond District Baron Gissendaner

  4. Project Team (cont.) Virginia Transportation Research Council Wayne S. Ferguson, Research Manager Steering Committee Steve Edwards, Transportation Engineer Senior, Traffic Engineering Division, Central Office Paul Kelley, Transportation Engineer, Location and Design Division, Central Office Charlie Kilpatrick, Fredericksburg Resident Engineer, Fredericksburg District Bob McCarty, Senior Field Operations Engineer, Federal Highway Administration - Richmond Ginger Quinn, District Safety Officer, Traffic Engineering Section, Salem District Nancy Berry, Transportation Engineering Program Supervisor, Location and Design Division, Central Office Additional Current and Former Resident Engineers Bill Bushman Angela Tucker Willie Gentry Alan Leatherwood

  5. Problem Statement • Public and transportation-agency values concerning the location of roadway guardrails are in need of clarification • The concerns of Virginians for adequate guardrails are high relative to the national norms • Current practice in some VDOT Districts for selecting locations for new guardrails is based on citizen complaints, a general knowledge of roadway needs from local engineers, and accident history

  6. Problem Statement (cont.) • Kentucky has developed a hazard-index point system (Kentucky Transportation Center Report KTC-89-39 "Warrants and Guidelines for Installation of Guardrail") • There are hundreds of candidate locations on the thirteen-county secondary system of Richmond District • Particular locations in New Kent and Charles City County have been the focus of a related preliminary study in Richmond District

  7. Purpose and Scope The effort will adopt quantitative and qualitative factors/endpoints and develop associated cost-benefit-risk tradeoff methodology to support the preliminary screening and subsequent evaluation of guardrail site selection and upgrading with limited available funding

  8. Purpose and Scope (cont.) • Four associated objectives: • Review and evaluation of what others have done • Adoption of assessment methods and quantitative and qualitative factors/endpoints • Development of a tradeoff methodology • Specification and prototype development of databases • Acknowledge that guardrails sometimes increase danger to vehicles

  9. A Data Driven Approach to Risk Assessment and Safety Evaluation of Guardrail

  10. Motivation A data driven approach to assessing risk and evaluating safety of candidate guardrail locations by determining data uses for screening and evaluation phases, identifying data needs, and evaluating data collection methods.

  11. Screening • Select corridors to examine

  12. Evaluation • Select locations along given corridor

  13. Data Needs • Screening • Guardrail inventory • % unprotected hazards • % guardrail coverage • % substandard guardrail • Accident history • FO accidents per DVMT • Fatalities caused by FO accidents • ADT • Complaint record

  14. Data Needs (cont.) • Evaluation • Cost (installation, upgrade) • Length of hazard • Severity of hazard • Shoulder width • Slope • Curvature

  15. Accident Statistics • Disadvantages • Unreported accidents • Severity iceberg • First and most harmful event • Fatalities do not occur frequently enough to be statistically predictive • Random nature of road accidents (Adams, 1996), (Michie and Bronsted, 1994)

  16. Accident Statistics (cont.) • Advantages • Available and assessable • Factual • Public interest (Adams, 1996), (Michie and Bronsted, 1994)

  17. New Kent Case Study • Initial Data Collection • Routes 609-622 • Corridor Analysis • Corridors for which guardrail inventory is available • Routes 33, 106, 249, 273

  18. Corridor Analysis • Compare routes for frequency and severity of accidents • Select routes that have greatest accidents/miles • Compare results with current guardrail inventory • Advantages • Reduce random chance associated with accidents • Use summary statistics available in HTRIS

  19. Corridor Analysis (cont.) • Disadvantages • Overlooks role of hazardous locations • Many locations of mediocre severity vs. one location of very high severity

  20. Corridor Screening

  21. Corridor Screening (cont.)

  22. Objective Develop a graphical tool for a guardrail and hazard inventory system for resource allocation and decision making

  23. Access to the New Kent Guardrail Data • Graphically represent what resident engineers know using an electronic map indicating the locations of: • Guardrails • Obstacles • Accidents • Complaints, etc.

  24. Electronic Map • Layered spatial data, creating different views • Regional view • Zone view • Corridor view • Site view

  25. Regional View